My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04102018 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2018
>
04102018 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:28:31 PM
Creation date
4/24/2018 11:09:43 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING APRIL 10, 2018 104 <br />Ten percent (10%) Bid Security Check was submitted. <br />I: M <br />Part A Total <br />Part B Total <br />$433,362.50 <br />Part C Total <br />Part D Total <br />Part E Total <br />Part F Total <br />Part G Total <br />Part H Total <br />Part I Total <br />OZINGA READY MIX <br />715 West Ireland Road <br />South Bend, IN46614 <br />Bid was signed by: Scott Underwood <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />IC G <br />Part A Total <br />Part B Total <br />$409,125.00 <br />Part C Total <br />Part D Total <br />Part E Total <br />Part F Total <br />Part G Total <br />Part H Total <br />Part I Total <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 SR 23 <br />South Bend, IN 46614 <br />Bid was signed by: Joshua McCormick <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />Indiana Local Business Preference Claim form submitted. <br />M <br />Part A Total <br />$1,542,800.00 <br />Part B Total <br />NO BID <br />Part C Total <br />$27,900.00 <br />Part D Total <br />NO BID <br />Part E Total <br />NO BID <br />Part F Total <br />NO BID <br />Part G Total <br />NO BID <br />Part H Total <br />NO BID <br />Part I Total <br />$74,880.00 <br />WALSH & KELLY, INC. <br />24358 SR 23 <br />South Bend, IN 46614 <br />�I <br />[I, <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.