Laserfiche WebLink
S4, <br />Tuesday April l7th. ,1923. Continued <br />Bid of Williston Construction Company. <br />' walk per sq. ft£. <br />$.20 <br />Curb per lin ft. <br />.60 <br />` Trinidad sheet asphalt per sq. y+l. <br />2.09 <br />..Mexican Asphalt per sq. yd: <br />1.93 <br />' Trinidad Asphaltic concrete per sq. <br />yd, <br />1.79 <br />' Mexican Asphaltic concrete per-sq. <br />yd, <br />1.63 <br />Resetting manholes each <br />3,00 <br />Resetting storm water grates each <br />43.00 <br />` Check $175.00 <br />RESURFACING OF EDDY STREEt FROM LA SALLE AVENUE TO NORTH LINE OF <br />SOUTH- BEND AVENUE. <br />Bid of White Construction Co. <br />-Walk per sq. ft. <br />S.20 <br />Curb per lin ft. <br />.50 <br />Grading per cu. yd. <br />1.02 <br />Trinidad sheet 'asphalt per sq. yd. <br />2.05 <br />Mexican Sheet asphalt, per sq. yd. <br />1.90 <br />Trinidad asphaltic ennerete per sq. <br />yd. $1.75 <br />Mexican Asphaltic concrete per sq. yd. $1.60 <br />Storm water inlets complete <br />13,00 <br />8 inch conduit pipe per lin ft. <br />1.00 <br />Marginal curb per lin ft. <br />.49 <br />Manholes each reset <br />3.00 <br />.Storm water inlets each <br />3.00 <br />.Certified Check $570.00 <br />Bid of Highways,Improvement Co. ' <br />>Grading per cu. yd. <br />1.60 <br />Metrolpolitan Brick per sq. yd. <br />2.31 <br />Veedersburg.brick per sq. yd, <br />2.11 <br />Marginal curb per lin ft. <br />.50 <br />Manholes reset each <br />3.50 <br />Storm water inlets, each <br />3.50 <br />Check $570.00 ' <br />Pike Construction Co. <br />Trinidad Sheet Asphalt per sq. Yd. <br />'2.16 <br />Mexi can Sheet asphalt per sq.' yd.' <br />1.96 <br />} Triniad asphaltic concrete per sq. <br />yd,1.87 <br />Mexican asphaltic concrete per sq, <br />yd.1.67 <br />Manholes beset each <br />3.00 <br />Storm water inlets reset each <br />3.00 <br />Certified; Check $570.00 <br />Bid of Williston Construction Co. <br />Walk per sq. ft. <br />.20 <br />Curb per lin ft, <br />.60 <br />Trinidad sheet asphalt per sq. yd, <br />2.09 <br />Mexican skeet asphalt per sq. yd. <br />1.93 <br />Trinidad asphaltic concrete per sq, <br />yd.1,79 <br />Mexican asphaltic concrete per sq. <br />yd, 1.63 <br />Manholes per each <br />3.00 <br />Storm water inlets reset each <br />3.00 <br />Check $570.00 <br />