Laserfiche WebLink
PAVEMENT ON LST. ALLEY WEST OF SCOTT SIDRTT FROM COLFAX AVE11UE TO <br />LASALLE AVENUE. <br />Bid of Hoban & Roach <br />grading per cu. yd. <br />concrete pavement per sqo yd* <br />inlets, each <br />8 in.ch pipe per alin ft. <br />Manholes reset, each <br />Storm water.inlets, each <br />nid of Highways Material s Co. <br />grading per cu. yd. <br />concrete pavement per cu. yd. <br />inlets, each. <br />8 inch pipe per lin ft. <br />manholes reset, each <br />Storm water inlets, each <br />Bid of H. N. Barnes. <br />$1.63 <br />2.75 <br />3.00 <br />1.00 <br />3.00 <br />13.00 <br />1.50 <br />3.50 <br />5.00 <br />1.00 <br />5.00 <br />15.00 <br />concrete pavement per sq. yd. 2.75 <br />PAVEMENT ON -ALLEY EAST OF ST. JOSEPIR STREET <br />FROM WAYNE STREET <br />TO THE 2n.d; ALLEY SOUTH OF WAYNE STREET. <br />Bid of Highways Materials Co. <br />grading per cu* yd. <br />$1.50 <br />inlets, each <br />concrete pavement per sq. yd. <br />5.00 <br />3.50 <br />8 inch pipe per lin ft. <br />1.00 <br />Manholes reset, each <br />5.00 <br />Storm water inlets, each <br />15.00 <br />RESURFACTNG 6R I UDSON AVENUE PROM PORTAGE <br />.AVENUE TO RIVERSIDE DRIVE. <br />Bid of White Construction -Co. <br />curbing per lin ft. <br />$.50 <br />walk per sq. ft. <br />- .20 <br />Grading per cu'. yet. <br />1.05 <br />Trinidad Sheet asphalt per sq. yd., <br />2.05 <br />Mexican Sheet'Asphalt per sq. yd. <br />I.90 <br />Trinidad &spMltic concrete per sq. yd. <br />1.75 <br />Mexican'asphaltic concrete per sq. yd. <br />1.60 <br />Manholes per ft. each <br />3.00 <br />13.00 <br />Storm water inlets, each <br />1.00 <br />8 inch pipe per lin ft. <br />Marginal curb per Tin ft. <br />.40 <br />- Check $175.00 <br />Bid of Highways Improvement.Co. <br />Grading per cu. yd. <br />1.05 <br />Veedersburg Brick Bituminous filler per sq. <br />yd. 2.11 <br />Metrolpolitation Brick Bitnuminous filler per sqy. yd.$2.31 <br />Manholes per ft. <br />3.50 <br />8 inch <br />resetting manholes each <br />3.50 <br />Marginal curb per lin. ft. <br />.50 <br />Bid of the Pike Construction Company. <br />Trinidad Sheet asphalt per sq. yd. <br />$2.16 <br />Mexican Sheet asphalt per sq. yd. <br />1.96 <br />Trinidad asphaltic concrete per sq. yd. <br />1.57 <br />1.67 <br />Mexican asphaltic concrete per sq. yd. <br />Manholes per ft. <br />3.00 <br />Resetting manholes each <br />3.00 <br />