My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/18/1925 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1925
>
08/18/1925 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:03:24 PM
Creation date
4/12/2018 11:10:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/18/1925
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />Bias were received ano Pero as roliaws:» <br />Pipe sewer on Sunnymode Avenue from Harriett Street to a point 15 ft. <br />�$st of the west line of lot, 3C2 Sunnyme-de Addi'Vi6n" as provided in Improvement <br />Resolution No. 1567. Bids were submitted by S. U. Ackerman, Giovanni Lugaresi, <br />( See files for original bids.) <br />Grade, curb and w&lk on Jefferson Avenue from 18th. Street to 26th. <br />Street. Bids were submitted by A. W. Reed & Sens. Alex Bukowski, J A. Barnes, <br />and Eston Ball ( See files for original bids.) <br />Pavement on Miami Street from and of present pavement to DorwAyer Ave. <br />Bids submitted by H. N. Barns, Reith-Riley Construction' Co.' Tha' Albert Construction Co. <br />Tryckenham Land & Investment; Co. Hoban & Roaah, H. W. Reed & Sons. ( See files for <br />original bids.) All -above bids were referred to the Engineering Dept,. for tabulationto be reported on Wednesday August f9th. 1925. '.11 <br />Petition received signed by the Hotel La Salle by J. C. Hoffman eta. <br />for boulevard lights on corner of Michigan Street, and La Salle Avenue. Saute filed and <br />referred to the Pole and Wire Inspector for investig&tiofi afid kepbrt;...... <br />Partial estimates filed and allowed as follows: - <br />Pavement on 21st. Street from Mishawaka Avenue to Pleasant Street <br />to Williston Construction•Ce;-at......$4,214.94 <br />Pavement on 27th. Street from Mishawaka Avenue to Pleasant Street to <br />Williston Construction Cmpany at......$5,468.69 <br />-Grade,curb and walk on William Street from Calvert Street to Ewing <br />Avenue to Alex Bukowski at ............ S4,308.71 ....... <br />Pavement on Rose Street from Portage Avenues to Kessler Blvd. also <br />Kessler Hlvd. from south line of lot 22 Portage Heights to.a lino -between W®rthwesterly <br />corner of lot 30 to Northeasterly line of let 5 Portage Hiehgts Addition to Williston <br />Construction Company at ...............$ <br />Copy of contract on pavement on Sample Street from Ely. curb line of <br />Prairie Avenue to the west curb line of Lafayette Street to Altert'Congtritction Co <br />at.........$40.549.04 <br />Pavement on Rose Street from Portage Avenue to K*'w&1er B'lvid.' and Kessler <br />Blvd. from South line of lot 22 Portage Hiehgts to a line between Northwesterly corner <br />of lot 30 to Northeasterly line of lot 5 Portage Hiehts Addition to Williston Constructi <br />Co. aV..0000460349173.42 ............. <br />• • Pavemrdrrt• on 27th. Street from Mishawaka Avenue to Pleasant, Street <br />to Williston Construction Company at........$5,468.69 <br />Pavement on 21st. St_re*t_from Mishawaka Avenue to Plemasnt Street <br />to Williston Consirruci,ion Company at...`0..44.214.94 <br />Pavement on 27th. Street from Mishawaka Avenue tp Pleasant Street <br />to Williston Construction Company at.00.0.0$519468.69 <br />Engineer filed estimated costs as follows: - <br />Sewer on Poland Street from Meade Street to a point 8 feet west of the <br />west line of the alley east of Kaley Street at ..... $1.187.00 <br />Sewer on Angina Avenue from Lafayette Street to Iroquois Street at $2.310. <br />Sewer on Morris Street from Prairie Avenue to Ewing,Avenue at. $4,464,J0 <br />Pavement on alley between Woodward Avenue and Riverside Drive from Leland <br />Avenue to Golden Avenue at........$6,282.00 <br />Pavement on the alley between Elder Street and Paris Street from Carroll <br />Street to 2nd. Alley west of Carroll Street at ..... $20924.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.