My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E(1) Resolution No. 2838
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
01-21-11 Packet
>
6E(1) Resolution No. 2838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 8:26:22 AM
Creation date
1/18/2011 3:32:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L FAUVA <br />Utility Coordination <br />LFA will provide utility coordination as well as utility plan requests and reviews. Coordination will <br />involve securing accurate plan locating in accordance with AASHTO guidelines. Level B locating will be <br />using IUPS locates identified in the survey. Level A locating (pot- holing /earth extraction) is not included <br />in the scope of design services. If the City desires this level of locating, LFA can provide these additional <br />services under supplemental agreement. <br />Any utility relocation agreements will be prepared by the City of South Bend. <br />Geotechnical In vestiriation and Resort <br />LFA's Sub - Consultant, Earth Exploration, Inc., will prepare the geotechnical investigation and report. <br />Geotechnical procedures will be in accordance with City of South Bend and AASHTO guidelines. The <br />geotechnical investigation and reports for the two future stages are not included in this scope of services. <br />Construction Plan Preparation Process <br />The Project will be designed according to current City of South Bend requirements. The submittal <br />requirements for the Project will include. <br />• Preliminary Plans and Environmental Screening Report <br />•.... Preliminary Field Check ... ............................... es <br />...........40 %Design and Design Information Reviewed. <br />*....R/W Plans -and Legal Descriptions ..................Proposed Permanent, Temporary R/W, and Easements. <br />• ....Public Information Meeting Plans ......... ............................... Exhibits of Proposed Construction Plans. <br />.... Final Plans ...................... ............................... 95% Final Plans, Computations, Quantities for Review. <br />• .... Final Tracings Submission .......................... ............................... 100% Final Plans, Ready for Letting. <br />• Bid Documents and Bidding <br />Environmental Documentation <br />Our Sub - Consultant, ASC Group, will perform the following screening level environmental tasks for this <br />Project Stage as well as the other two future stages. <br />The entire project area (as described in the July 2009 Preliminary Design Report and Plans) will be <br />reviewed for possible hazardous material in the individual property structures and below ground. <br />Additionally, a screening level investigation will be conducted for any significant historical resources <br />within the entire project area. The purpose of the environmental process will be to determine if there are <br />any documented resources or existing hazardous material that may be encountered in the construction of <br />the roadway improvements. The design submittal process will include the following associated <br />permitting and environmental documents: <br />Environmental Screening Report <br />Rule 5 Submission <br />-3 - Lawson - Fisher Associates P.C. <br />Project File 9018.95 <br />August, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.