My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E(1) Resolution No. 2838
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
01-21-11 Packet
>
6E(1) Resolution No. 2838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 8:26:22 AM
Creation date
1/18/2011 3:32:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L FATAYli <br />Roadway Design Features <br />The design of the South Main Street to Lafayette Connector will include the fundamental elements <br />developed in the South Main Street to Lafayette Boulevard Connector and Development Area — <br />Preliminary Design Report and Plans completed in 2009. This first stage of design will include the <br />realignment of existing Lafayette Blvd. and South Main Street from Ireland Road to existing South Main <br />Street approximately 400 ft. south of Chippewa Avenue, a total distance of approximately 1,600 ft. The <br />Connector will be designed as a four lane arterial. <br />A modern two -lane roundabout will be constructed on this connector just south of the Chippewa Station <br />Post Office branch office, mid- distance between Chippewa Avenue and Ireland Road. A two- lane/three- <br />lane collector type roadway will be constructed as a crossing element of the roundabout providing a <br />connection from the Showplace 16 Movie Theatre east to the roundabout with an approach and future <br />extension to South Michigan Street further to the east. For truck and factory access (to Kulzer Inc. and <br />Lock Joint Tube, Inc.) a two -lane local street will be designed connecting industrial /commercial drives on <br />the west side of Lafayette Blvd. to a minor intersection with the Connector approximately 750 ft. south of <br />the roundabout. This local street will align with and extend eastward to the existing section of Walter <br />Street between South Main and South Michigan. Detail of the conceptual design is included with Land <br />Acquisition Map in Attachment "F ". The following list documents the anticipated lengths and widths of <br />the various elements of the system: <br />South Main St. to Lafayette Connector: <br />Modern Two -Lane Roundabout: <br />Collector Roadway: <br />Local Street: <br />Surface Drainage: <br />City Utilities <br />Miscellaneous Design Elements <br />600 LFT 4 -lane widening of existing <br />1,000 LFT 4 -Lane on new alignment <br />Traffic Signal Modernization (Lafayette at Ireland) <br />(Estimated 80 ft. Right -of -Way) <br />Approximately 230 ft. Diameter <br />670 LFT 2- Lane /3 -Lanes on new alignment <br />(Estimated 60 ft. Right -of -Way) <br />350 LFT 2 -lanes on new alignment <br />(Estimated 50 ft. Right -of -Way) <br />Combined curb and gutter, inlets, manholes and <br />enclosed drainage system <br />Water, sanitary sewer extensions on new alignment <br />sections. <br />Sidewalks, ADA ramps, concrete drives, traffic signage, <br />pavement markings, small segmental block retaining <br />walls (as needed), <br />Roadway design elements will be consistent with applicable City of South Bend -and AASHTO standards <br />and specifications. <br />- 2 - Lamon- Fisher Associates P. C.: <br />Project File 9018.95 <br />August, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.