My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/10/1978 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1978
>
07/10/1978 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2011 9:03:46 AM
Creation date
12/8/2010 11:20:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/10/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
184 <br />REGULAR MEETING JULY 10, 1978 <br />BID AWARDED - AIR COMPRESSOR FOR FIRE DEPARTMENT <br />Chief Oscar Van Wiele advised the Board that he had reviewed the <br />bids received for an air compressor for the Department. He noted <br />that the bid of Centurion Fire & Safety Equipment Company was low <br />at $9,750.00. He recommended acceptance of the low bid, with the <br />addition of an on /off switch at $50.00 and a deduction of $300.00 <br />for deletion of check valves between air vessels in the cascade <br />system. Upon motion made by Mr. Mullen, seconded by Mr. Brunner <br />and carried, the Board accepted the recommendation as outlined by <br />Chief Van Wiele and accepted the low bid of Centurion Fire And <br />Safety Equipment Company for one Mako 5,000 PSI Air Compressor <br />in the net amount of $9,500.00. <br />CHANGE ORDER #1 AND PROJECT COMPLETION AFFIDAVIT APPROVED FOR <br />CREST MANOR SECTION TWO SANITARY SEWER PROJECT <br />Change.Order. #1 in the Crest Manor Section Two Sanitary Sewer <br />Project was submitted to the Board by John Leszczynski, Manager <br />of the Bureau of Public Construction. The contract is with Taylor <br />Construction Company. The Change Order increases the contract` <br />by $78.00 and is to adjust the contract to as -built plans. <br />Upon motion made by Mr. Mullen, seconded by Mr. Brunner and carried, <br />the Change Order was approved. The Project Completion Affidavit <br />was then submitted to the Board. Total project cost was listed at <br />$3,377.00 and the Maintenance Agreement is to extend through June <br />19, 1981. Upon motion made b_y Mr. Mullen, seconded by Per. Brunner <br />and carried, the Affidavit was approved, subject to receipt of the <br />required maintenance bond. <br />BID ADVERTISING APPROVED — 1978 CURB CONTRACTS <br />John E. Leszczynski, Manager of the Bureau of Public Construction, <br />submitted to the Board a request to advertise for')bids for the <br />following projects under the 1978 Curb Contracts. <br />Project I Reconstruction of curbs on Riverside Drive, along Leeper <br />Park from Lafayette Blvd. to a point 450' from the <br />intersection and the widening of the North Side of <br />Howard Street, between Niles Avenue and Foster Street, <br />approximately 1501. <br />Project II- Widening of Ironwood Drive at its intersection with <br />Jefferson Boulevard, to widen Ironwood an additional <br />eight feet to increase traffic flow through the <br />intersection and to reconstruct the curb around a <br />traffic island on the north side of the intersection of <br />Ireland Road and York Road to eliminate a safety hazard <br />caused by motorists driving over the island. <br />Upon motion made by Mr. Mullen, seconded by Mr. Brunner and carried, <br />the Board approved the request and directed the Clerk to advertise <br />for bids. <br />FILING OF QUARTERLY ACQUISITIONS REPORT - DISCOVERY HALL MUSEUM <br />Richard Welch, Director of Discovery Hall Museum, submitted to <br />the Board the quarterly report of acquisitions through June 30. <br />The following items were acquired: <br />Studebaker Pins and Badge <br />Studebaker Key <br />Conestoga Wagon Jack, 1822 <br />TALOS Missile dolly <br />Stephenson Underwear Crate <br />S.B. Brewing Association bottles <br />Muessel Brewery Crate, Kamm Brewery <br />Labels, Drewry's Anniversary <br />Bottles <br />Printing Press <br />TALOS production line <br />photographs <br />Donor <br />Joseph Wilczewski <br />Robert Wagner <br />purdhased <br />The Bendix Corporation <br />David Dunlap <br />Discovery Hall Associates <br />Rink Riverside Printing <br />Michael Wells <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.