Laserfiche WebLink
59 <br />REGULAR MEETING <br />MARCH 27, 1978 <br />5,000 <br />T <br />HAE <br />Sand Surface <br />Type IV <br />@ <br />$16.40 <br />— $82,000.00 <br />5,000 <br />T <br />HAC <br />Sand Surface <br />Type D <br />@ <br />$12.60 <br />- $63,000.00 <br />5,000 <br />T <br />HAE <br />Slag Surface <br />Spec <br />@ <br />$18.70 <br />- $93,500.00 <br />5,000 <br />T <br />HAC <br />Slag Surface <br />Spec <br />@ <br />$14.60 <br />- $73,000.00 <br />150 <br />T <br />Bit. <br />Material Tack <br />@$140.00 <br />- $21,000.00 <br />1,000 <br />T <br />Bit. <br />Patching Material <br />@ <br />$15.00 <br />- $15,000.00 <br />Kuert Concrete Company Bid was signed by A.S.J. McMann, <br />South Bend, Indiana non - collusion affidavit was in <br />order and a loo bid bond was <br />submitted. <br />Bid - 600 <br />C.Y. <br />Ready <br />Mix <br />Concrete <br />Class <br />A <br />@ <br />$34.00 - <br />$20,400.00 <br />150 <br />C.Y. <br />Ready <br />Mix <br />Concrete <br />Class <br />B <br />@ <br />$30.90 - <br />$ 4,635.00 <br />600 <br />C.Y. <br />Ready <br />_Mix <br />Concrete <br />Class <br />A <br />@ <br />$33.50 - <br />$20,100.00 <br />Emulsified Asphalts Bid was signed by David M. Yates, <br />Chicago, Illinois non - collusion affidavit was in <br />order and a certified check was <br />submitted with the bid. <br />Bid - 600,000 G Emulsified Asphalt @ $0.3496 - $209,760.00 <br />Eckler Lahey Lumber Co. Bid was signed by James H. Lahey, <br />South Bend, Indiana non - collusion affidavit was in <br />order and a certified check was <br />submitted with the bid. <br />Bid - 3,000 Bags Portland Cement @ $3.26 - $ 9,780.00 <br />St. Joseph Materials Co. Bid was signed by Richard D. Marrese, <br />South Bend, Indiana non - collusion affidavit was in order <br />and a 10% bid bond was submitted. <br />Bid - 5,000 T C. Aggregate #73 @ $1.75 - $ 8,750.00 <br />8,000 T C.Aggregate #E9 @ $2.00 - $16,000.00 <br />2,000 T Fine Aggregate #14-1 or #14 -2 @ $1.35 $ 2,700.00 <br />The Levy Company Bid was signed by Richard D. Marrese, <br />Chesterton, Indiana non- collusion affidavit was in order <br />and a 10% bid bond was submitted. <br />Bid - 15,000 T Min. Aggregate #2 @ $4.75 - $71,250.00 <br />5,000 T C. Aggregate #73 @ $4.40 - $22,000.00 <br />2,000 T Crse. Aggregate @ $3.75 - $ 7,500.00 <br />Walsh & Kelly, Inc. Bid was signed by Patrick H. Cahill, <br />South Bend, Indiana non - collusion affidavit was in order <br />and a 10% bid bond was submitted. <br />Bid - 15,000T <br />Hac <br />Surface Limestone @ $11.90 <br />- $178,500.00 <br />15,000T <br />HAC <br />Surface Slag <br />@ 12.25 <br />- $183,750.00 <br />20,000T <br />HAC <br />Binder - #8 <br />or #E9 @ $9.50 <br />- $190,000.00 <br />2,500T <br />HAC <br />Binder - #11 <br />@ $10.70 <br />- $ 26,750.00 <br />5,000T <br />HAE <br />Sand Surface <br />Tyve IV @ $16.00 <br />- $ 80,000.00 <br />5,000T <br />HAC <br />Sand Surface <br />Type D @ $11.65 <br />- $ 58,250.00 <br />5,000T <br />HAE <br />Slag Surface <br />@ $18.80 <br />- $ 94,000.00 <br />5,000T <br />HAC <br />Slag Surface <br />@ $14.00 <br />- $ 70,000.00 <br />150 <br />T Bit. Material <br />Tack @ $120.00 <br />- $ 18,000.00 <br />Deputy City Attorney Terry A. Crone advised the Board that the <br />bids of the Arco Engineering Construction Company and of Bituminous <br />Materials were defective in that the non - collusion affidavits were <br />not notarized. Upon motion made by Mr. McMahon, seconded by Mr. <br />Brunner and carried the bids of Arco Engineering Construction Company <br />and Bituminous Materials were rejected as being defective and the <br />bids which were read were referred to the Street Department for <br />review and recommendation. <br />