Laserfiche WebLink
357 <br />REGULAR MEETING FEBRUARY 25, 1980 <br />Six 1980 International <br />S- Series, Model 1954 $28,449.00 each <br />Trade allowances: <br />#255, 256, 228, <br />244, 266 and <br />284 $18,250.00 total <br />Upon a motion made by Mr. McMahon, seconded by Mr. Kernan and carried, <br />the bids were referred to Sean Watt, Director of the Division of <br />Transportation, for review and recommendation. <br />The following Street Material bids were opened and publicly read: <br />Rieth -Riley Construction Bid was signed by Richard D. Ruhlman, <br />P. 0. Box 1775 non - collusion affidavit was in order, <br />South Bend, Indiana and a 10% bid bond was submitted. <br />HAC <br />Surface <br />- #11 Limestone <br />$19.10 /ton <br />15,000 <br />ton <br />HAC <br />Surface <br />- #11 B.F. Slag <br />19.30 /ton <br />15,000 <br />ton <br />HAC <br />Surface <br />- Spec. Steel Slag <br />19.00 /ton <br />5,000 <br />ton <br />HAC <br />Surface <br />- Type "D" Sand <br />18.90 /ton <br />5,000 <br />ton <br />HAC <br />Surface <br />- Spec. (Slag Sand) <br />22.00 /ton <br />5,000 <br />ton <br />HAC <br />Binder <br />#8 and #9 <br />15.20 /ton <br />20,000 <br />ton <br />HAC <br />Binder <br />#11 <br />16.40 /ton <br />2,500 <br />ton <br />Bituminous <br />Patching Material <br />23.60 /ton <br />1,000 <br />ton <br />Koch Asphalt Company <br />4900 S. Mason Avenue <br />Chicago, Illinois <br />Emulsified Asphalt <br />Walsh & Kelly, Inc. <br />24358 State Road 23 <br />South Bend, Indiana <br />Bid was signed by David M. Yates, <br />non - collusion affidavit was in order, <br />and a cashier's check in the amount <br />of $39,000.00 was submitted. <br />$0.5647/gal. 600,000 gal. <br />Bid was signed by Thomas 0. Walsh, <br />non - collusion affidavit was in order, <br />and a 10% bid bond was submitted. <br />HAC Surface - #11 Limestone <br />$17.40 /ton <br />15,000 <br />ton <br />HAC Surface #11 B.F. <br />Slag <br />17.85 /ton <br />15,000 <br />ton <br />HAC Surface - Spec. <br />Steel Slag <br />17.40 /ton <br />5,000 <br />ton <br />HAC Surface - Type "D" <br />Sand <br />17.50 /ton <br />5,000 <br />ton <br />HAC Surface - Spec. <br />(Slag Sand) <br />22.00 /ton <br />5,000 <br />ton <br />HAC Binder #8 and #9 <br />14.75 /ton <br />20,000 <br />ton <br />HAC Binder #11 <br />15.30 /ton <br />2,500 <br />ton <br />Bituminous Material <br />- Tack <br />175.00 /ton <br />150 <br />ton <br />Bituminous Patching <br />Material <br />21.50 /ton <br />1,000 <br />ton <br />Arco Engineering <br />Bid <br />was signed by <br />William H. Reiff, <br />705 South Beiger <br />non - collusion affidavit <br />was in order, <br />Mishawaka, Indiana <br />and <br />a 10% bid bond <br />was submitted. <br />HAC Surface - #11 Limestone <br />$21.25 /ton <br />15,000 <br />ton <br />HAC Surface #11 B.F. <br />Slag <br />21.50 /ton <br />15,000 <br />ton <br />HAC Surface - Spec. <br />Steel Slag <br />22.50 /ton <br />5,000 <br />ton <br />HAC Surface - Type "D" <br />Sand <br />20.50 /ton <br />5,000 <br />ton <br />HAC Surface - Spec. <br />(Slag Sand) <br />25.00 /ton <br />5,000 <br />ton <br />HAC Binder #8 and #9 <br />16.30 /ton <br />20,000 <br />ton <br />HAC Binder #11 <br />16.60 /ton <br />2,500 <br />ton <br />Bituminous Material <br />- Tack <br />170.00 /ton <br />150 <br />ton <br />Fine Aggregate #14 -1 <br />or #14 -2 <br />2.30 /ton <br />2,000 <br />ton <br />Bituminous Materials Co. <br />Bid <br />was signed by <br />Philip <br />Ehrman, <br />2720 East Durbin <br />non - collusion affidavit <br />was in order, <br />Warsaw, Indiana <br />and <br />a 10% bid bond <br />was submitted. <br />Emulsified Asphalt <br />$0.6228/gal. <br />600,000 <br />gal. <br />