Laserfiche WebLink
243 <br />SPECIAL MEETING <br />DECEMBER 19. 1979 <br />Roper I.B.G. Bid was signed by Gerhard Schutz, <br />Wheeling, Illinois non- collusion affidavit was in <br />order and a 5% bid bond was submitted. <br />Skylight <br />Bid Item #121 $825,240.00 <br />Mr. McMahon indicated engineering estimates for the project were <br />as follows: <br />Structural Steel - $255,000.00 <br />Curtainwall and Skylight $1,097,000.00 <br />Quarry Tile $75,000.00 <br />Mechanical - $160,000.00 <br />Electrical - $75,000.00 <br />Upon motion made by Mr. McMahon, seconded by Mr. Mullen and <br />carried, the bids were referred to the Division of Engineering, <br />the Construction Manager and C. F. Murphy and Associates for <br />review and recommendation. <br />Upon motion made by Mr. McMahon, seconded by Mr. Mullen and carried, <br />the meeting adjourned at 9:55 a.m. <br />