My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/1979 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1979
>
10/01/1979 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2011 4:26:35 PM
Creation date
11/23/2010 2:02:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/1/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
210 <br />REGULAR MEETING <br />Ermco, Inc. <br />Indianapolis, Indiana <br />Bid- $137,510.00 <br />Combination Bids - <br />Harry H. Verkler Contractor, Inc. <br />OCTOBER 1. 1979 <br />Bid was signed by J. A. Maddox, <br />non - collusion affidavit was in <br />order and a 5% bid bond was <br />submitted. <br />Bid was signed by Harlan A. Lusk, <br />non - collusion affidavit was in <br />order and a 5% bid bond was <br />submitted. <br />Bid Packages #105, #106, #107, #108 #109, #110, #111 <br />Total - $2,960,000.00 <br />Single Bid #105 <br />#106 <br />#107 <br />#108 <br />#109 <br />#110 <br />#111 <br />$14,200.00 <br />$2,690,000.00 <br />$67,900.00 <br />$248,800.00 <br />$9,400.00 <br />$8,100.00 <br />$3,600.00 <br />Wright Construction Corp. Bid was signed by Fred G. Wright <br />III, non - collusion affidavit was <br />in order and a 5% bid bond was <br />submitted. <br />Bid Packages #105, #106, #107, #108 and #109 <br />Total - $2,787,522.00 <br />Mr. McMahon advised the Board that the engineering estimates for <br />the project were as follows: <br />Bid <br />Package <br />#105 <br />$ 8,000.00 <br />Bid <br />Package <br />#106 <br />2,343,000.00 <br />Bid <br />Package <br />$107 <br />40,000.00 <br />Bid <br />Package <br />#108 <br />40,000.00 <br />Bid <br />Package <br />#109 <br />10,000.00 <br />Bid <br />Package <br />#110 <br />4,000.00 <br />Bid <br />Package <br />#111 <br />1,000.00 <br />Bid <br />Package <br />#112 <br />50,000.00 <br />Bid <br />Package <br />#113 <br />112,000.00 <br />Bid <br />Package <br />#114 <br />150,000.00 <br />Total <br />$2,758,000.00 <br />Deputy City Attorney Terry A. Crone advised the Board that the <br />bid submitted by the Schaum Electric Company did not contain the <br />required bid bond or certified check as required. Upon motion <br />made by Mr. McMahon, seconded by Mr. Brunner and carried, the <br />bids were referred to the Division of Engineering and the Construction <br />Manager for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.