My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Untitled (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
09-17-10 Packet
>
Untitled (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 10:00:43 AM
Creation date
9/14/2010 3:05:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Asbestos Inspector. The survey will begin with a walk- through of the existing structure to <br />document the locations of friable and non - friable materials that may be present. Friable <br />materials are those that can be pulverized or reduced to powder by moderate pressure, <br />such as spray - applied fireproofing and acoustical materials, acoustical ceiling tiles and <br />most thermal system insulation. Non - friable materials are those that cannot be crumbled <br />easily, such as resilient floor tiles and cement asbestos (Transite) board. Although the <br />emphasis is on detecting friable materials, the possible presence of non - friable ACBM <br />must also be considered, since non - friable materials may be pulverized or otherwise <br />damaged and release asbestos fibers into the air during building demolition. <br />The next phase of the survey will involve the selection of sampling areas and sample <br />locations. Sample areas are typically grouped based on material homogeneity_ A <br />homogeneous area is one that contains suspect materials that appear by texture, color <br />and wear to be uniform and applied or installed at the same general time period. After <br />sampling areas have been determined and recorded, representative samples of suspect <br />materials will be collected. Only suspect material samples will be submitted for <br />laboratory analyses. Samples will be sealed in airtight containers, labeled, and <br />forwarded to an approved laboratory for analysis by the EPA - recommended method of <br />Polarized Light Microscopy coupled with dispersion staining. <br />Once sample analyses have been received, results will be reported as a Letter Report to <br />the City of South Bend. The requisite Indiana Department of Environmental <br />Management (IDEM), Notification of Demolition and Renovation Operations forms (with <br />documentation) will also be prepared for signature by an "authorized representative" of <br />the City of South Bend, and subsequent facsimile submittal to the Office of Air Quality. <br />Task 2 — Locate Property Corners / Staking <br />CBBEL will hire a sub - consultant to locate and stake the property corners to verify the <br />limits of the demolition. <br />Task 3 — Design Services / Demolition Bid Documents <br />CBBEL staff will design and prepare final bid documents for the project. Plans and <br />specifications will be prepared in accordance with City Standards and Specifications. <br />The bid documents will include recommendations provided in the Phase I Environmental <br />Report and Asbestos Survey to address the requirements of the regulatory agencies <br />involved with this demolition. <br />Specifications will be developed utilizing standard specifications and general conditions <br />provided by the City in addition to CBBEL standard specifications. Applicable conflicts <br />will be brought to your attention for your input. <br />CBBEL staff will provide an opinion of probable cost based on the final bid documents. <br />This opinion will be based on the judgment of CBBEL engineering staff, supplemented <br />by local construction project history information provided by the City. <br />Christopher B. Burke Engineering Ltd. City of South Send: Demolition of the Building at 236 Sample St. <br />13D P01.090468.00001 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.