My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/29/10 Board of Public Works Special Meeting-
sbend
>
Public
>
Public Works
>
Minutes
>
2010
>
07/29/10 Board of Public Works Special Meeting-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2010 3:46:06 PM
Creation date
9/1/2010 3:01:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Agendas
Document Date
7/29/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL MEETING <br />JULY 2912010 224 <br /> Replacement <br /> <br />3 Concrete Approach Removal & <br />Replacement 5" Thick <br />25 <br />SYS <br />$40.00 <br />$1,000.00 <br />4 Alley Approach 25 SY5 $44.00 $1,100.00 <br />5 I4andicap Ramp 10 SYS $125.00 $1,250.00 <br />Total $54,550.00 <br />It was noted that Ortiz Concrete did not provide a S% bid security ar bond. The Clerk was <br />instructed to contact Ortiz Concrete and allow them 24 hours to provide a bond or security <br />check. Upon a motion made by Mr. Gilat, seconded by Mr. Inks and carried, the above <br />Quotations were referred to Engineering For review and recommendation. <br />ADJOURNMENT <br />There being no further business to come before the Board, upon a ranotion made by Mr. Gilot, <br />seconded by Mr. Littrell and carried, the meeting adjourned at 8:40 a.m. <br />BOARD OF PUBLIC WORKS <br />~~~ ~~ ~ <br />Gary A. Gilot, President <br />~' ~ <br />,~ ~w~. i` ~` .~.. `~.. <br />D nald E. s, Member <br />~ #.~ ~ ___ <br />Carl P. Littrell, Member <br />ATTEST: <br />_ ~L,'nda M. Martin, Cler .. <br />SPECIAL MEETING JULY 29, 2010 <br />The Special Meeting of the Board of Public Works was convened at 10:35 a.m. on Thursday, <br />July 29, 2010, by Board President Gary A. Gilot with Board Members Donald E. Inks and Carl <br />P. Littrell present. Also present was Board Attorney Cheryl Greene. <br />OPENING OF BIDS - STUDEBAKER AREA A DEMOLITION PHASE IV -BID PACKAGE <br />B _ PROJECT NO. 109-032 (AEDA TIF} <br />This was the date set for receiving and opening of sealed bids for the above referred to project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened. Board <br />Attorney, Cheryl Greene, stated she was looking through the bids to confirm that the Non- <br />Collusion form and bid bond were included and all paperwork was signed. She noted this is a <br />federally funded project and there are numerous other Federal requirements that must be met, so <br />all bids will be subject to confirmation that they conform to Federal requirements. Mr. Littrell <br />added that all bids received were from previously approved pre-qualified bidders that met all of <br />the requirements. Upon confirmation by Attorney Crreene that all bids met the preliminary <br />requirements of a Bid Bond, Non-Collusion Affidavit and were properly signed, the following <br />bids were publicly read: <br />BRANDENSURG )CNDUSTRIAL_SERVICE COMPANY <br />2625 South Loomis Street <br />Chicago, Illinois 60608 <br />Bid was Signed by: Mr. Jack Jasinowski <br />Non-Collusion Affidavit was in Order <br />Non-Discrimination Commitment Form was Completed <br />Five percent (5%} Bid Bond was Submitted <br />BID: $10,112,020.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.