Laserfiche WebLink
L FAQ... ATTACHMENT "C" <br />CITY OF SOUTH BEND, INDIANA <br />SOUTH MAIN ST TO LAFAYETTE CONNECTOR AND ROUNDABOUT <br />STAFF HOUR JUSTIFICATION -PROJECT DESIGN DEVELOPMENT <br />l <br />k F <br />W No. STAFF I10URS BY CLASSIFICATION Total SUBCONSl1LTANT <br />or <br />ement <br />, Shts. Proj. Manager Senior Eng Civil Eng. Senior Tech. Clerical Hours COST <br />PRELIMINARY DESIGN <br /> <br />Survev and Preliminary Plotting <br />Field Survey 4 6 320 330 <br />Location Route Control Survey and Plat #1 (By DLZ) $38,500 <br />Review Survey Field Data 8 8 <br />Coordination and Control of RW Sub-Consultant I 2 2 2 7 <br /> <br />Preliminary Plan Submittal <br />Designer Field Inspection 4 4 8 <br />Establish Grade Controls, Prepare Overall Gracie Profile 4 16 12 32 <br />Design Preliminary (ieometrics Prepare Overall Plan 2 8 24 12 46 <br />Utility Coordination I 8 4 4 17 <br />Prepare Preliminary Title & Index Sheets I 4 5 <br />Prepare Preliminary Typical Cross Sections I 2 8 8 19 <br />Prepare Preliminary Plan & Profile Sheets 2 8 16 24 50 <br />Roundabout layout and grading Plans 4 16 24 4 48 <br />Preliminary Right-of-Way Design 2 4 8 I4 <br />Preliminary Drainage Design 2 12 4 18 <br />Preliminary Sanitary Sewer Design I 10 4 15 <br />Preliminary Water Line rksi n 2 12 4 18 <br />Prepare Preliminary A roach & Drive Detail 2 16 18 <br />Prepare Preliminary Structure Data 4 12 16 <br />Prepaze Preliminary Cross Sections 4 24 24 52 <br />Prepare Conceptual Maintenance Of Traffic 2 8 10 <br />Preliminary Construction Cost Estimate I 2 4 I 8 <br />Environmental Screening Report - HazMat (by ASC Group) $9,127 <br />Environmental Screening Report - Hist. Arch (by ASC Group) $6,330 <br />Coordination and Control of Environmental Sub-Consultant I 2 2 2 7 <br /> <br />SUBTOTAL HOURS 0 17 76 180 464 9 746 $53,957 <br /> <br />RIGHT-OF-WAY DESIGN <br /> <br />Disposition of Preliminary Plan Review Comments 1 2 4 7 <br /> <br />Field Check Plans <br />Title Sheet and Index Sheet I 4 5 <br />Plan & Profile Sheets 2 6 24 24 56 <br />Signs 10 12 22 <br />Sign Structures 12 20 32 <br />Signals 12 6 18 <br />Intersection Details I 2 3 12 19 <br />Roundabout Details 24 12 24 62 <br />Retaining WaOs 4 6 <br />S cial Drainage Swctures 1 2 4 7 <br />Sanitary Sewer Details 2 8 16 26 <br />Waterline Details 2 6 12 20 <br />Maintenance of Traffic 2 4 R 16 30 <br />Cross Sections 8 28 42 80 <br />Construction Cost Estimate I _ 1 I 8 <br />Geotechnical Investigation (by Earth Exploretions, Inc.) $7,167 <br />Coordination and Control of Geotechnical SubConsultant I 6 9 <br />Pavement Design I 4 2 7 <br />Utility Coordination 1 8 1 3 <br />Hydraulics and Storm Sewer Calculations 6 16 46 <br />Preliminary Construction Cost Estimate I 8 I 12 <br />Field Check and Documentation 4 4 10 <br />Disposition of Field Check Revers Comments I 4 8 I S <br />Public Information Meeting Preparation <br />Traffic-Maintenance Plan I 2 4 7 <br />Displays 1 4 IZ 4 21 <br />Public Meeting 3 3 ? 9 <br />Disposition of Public Meetine Comments I 4 2 9 <br />Legal Descriptions and Transfer Documents (by DLZ. Indiana. LLC1 $94,120 <br />Coordination and Control of RW Su6Consultant I 2 7 <br /> <br />SUBTOTAL HOURS 0 26 78 213 228 IS 563 $101,287 <br />Larson-Fisher Assoria(es P.C. <br />Project File Na. 90/R. 95 <br />Atgus( 20/11 <br />