My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
08-06-10 Packet
>
6D(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 10:37:31 AM
Creation date
8/4/2010 8:42:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOHN E. FISHER, P.E. <br />GREGORY L. HOLDEN, P.E. <br />PAULA. HUMMEL, P.E. <br />PIPER C. TITTLE, P.E. <br />LAWSON-FISHER ASSOCIATES P.C. 9019.36 <br />July 28, 2010 <br />Mr. Bill Shalliol <br />Economic Development Planner <br />South Bend Redevelopment Commission <br />227 West Jefferson Blvd., Suite 1200S <br />South Bend, Indiana 46601 <br />RE: Engineering Services Proposal <br />South Michigan at Norman Street Access Study <br />Dear Mr. Shalliol: <br />JOHN A. MIDDLETON, P.E. <br />THOMAS S. SHARP, P.E. <br />THERESA E. HARRISON, P.E. <br />JON E. RIEMKE, P.E. <br />JEFFREY L. McKEAN, P.E. <br />RANDOLPH J. LINDLEY, P.E. <br />CHRISTOPHER J. JETER, P.E. <br />DENNIS A. ZEBELL, P.E. <br />BENJAMIN P. HOLDEN, P.E. <br />DAN G. DELGADO, P.E. <br />MICHAEL J. GUZIK, P.E. <br />MICHAEL F. JOHNSTON, P.E. <br />JEFFREY M. BYRD, P.E. <br />JARED M. HUSS, P.E. <br />SKY K. MEDORS, P.E. <br />Based upon several conversations, e-mails, and our meeting with you and Carl <br />Littrell on July 12, 2010, Lawson-Fisher Associates P.C. is submitting this proposal to <br />provide Professional Engineering Services for a Traffic Access Study and Report at the <br />referenced intersection. The following is a Project Description, Scope of Services, Fee <br />and Schedule for the project: <br />PROJECT DESCRIPTION <br />Problem Statement <br />In 2007, the City completed an LPA reconstruction project of the intersection of <br />South Michigan Street and Ireland Road. The project included improvements to <br />the existing street and drive approaches from south of the intersection north to <br />the intersection of South Michigan and Chippewa Avenue. Part of those <br />improvements was the construction of anon-mountable concrete center curb <br />from the Ireland Road intersection north to a point approximately 36-feet north of <br />the intersection of South Michigan Street and Norman Street. The purpose of the <br />center curb was to add to/replace a concrete divider used for access control and <br />channelization (protection) of the high volume of left turn traffic on the <br />southbound approach to the signal at South Michigan and Ireland Road. This <br />treatment was also constructed on the eastbound and northbound approaches. <br />Since the completion of construction in 2007, the City has been requested to <br />remove the concrete center curb directly in front of the Norman Street approach <br />in order to allow southbound Michigan Street traffic access for turns onto Norman <br />Street. The City has been mindful of those requests; however, it has considered <br />that traffic should be allowed sufficient time to become operationally accustomed <br />to the intersection, as well as to ascertain if overall traffic volumes would increase <br />at the intersection. <br />525 WEST WASHINGTON AVENUE • SOUTH BEND, INDIANA 46601 •574-234-3167.574-236-1330 (FAX) <br />
The URL can be used to link to this page
Your browser does not support the video tag.