My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(3) Proposal for landscaping and engineering services
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
07-09-10 Packet
>
6B(3) Proposal for landscaping and engineering services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 9:06:08 AM
Creation date
7/7/2010 8:43:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task 2: Construction Documents: <br />lul~~ 6, 3010 <br />a) Construction Documents: After review and approval from City staff, Danch Harner will provide bid <br />ready, final construction drawings that will include existing conditions, layout plan, landscape plans, <br />details, specifications, and final construction cost estimates for the improvements. <br />Cost for this task would be $4,900 <br />Task 3: Bidding: <br />a) Bidding: Danch Harner will provide bidding and negotiating services at a time and material basis. <br />Task 4: Construction Inspection: <br />a) Construction inspection: If required, construction inspection services will be provided at a time and <br />material basis and will consist of monitoring day to day construction methods and practices to <br />insure proper installation of the trail, amenities, landscape, and any other project components. <br />Weekly progress reports will be sent to the City and Contractor for review and action. A final punch <br />list would be developed and issued to the City and Contractor before issuing substantial completion. <br />Summary of Fees: <br />Task Fee <br />1 Topographic Survey $3,900 <br />2 Construction Documents $4,900 <br />3 Bidding & Negotiation Time & Materials <br />4 Construction Inspection Time & Materials <br /> Project Total: $8,800 <br />Revisions to the plans requested by the City would be completed at our standard hourly rates (attached). <br />If you have any questions, please feel free to call our office. <br />Items approved to proceed: <br />Approved By & Date: <br />Sincerely, <br />J~fr~y r. 3au,~-~ <br />Jeffrey Ballard, RLA <br />Senior Landscape Architect <br />Danch Harner & Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.