My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A(2) Asbestos, Environmental, Demo 507 W. Western
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
04-23-10 Packet
>
6A(2) Asbestos, Environmental, Demo 507 W. Western
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 10:51:56 AM
Creation date
4/20/2010 4:06:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />April 15, 2010 <br />Page 3 of 3 <br />PART TIME INSPECTOR: <br />45-day project (assumes 32 work days or 128 hours @ $65/hr). $8,320.00 <br />DESIGN ENGINEER: <br />60-day project (assumes 43 work days or 40 hours @ $110/hr). 4 400.00 <br />Estimated Total $12,720.00 <br />TOTAL PROJECT SERVICES <br />Wightman Petrie will provide the services discussed above on a not-to-exceed fee of: <br />$27.220.00. <br />Be assured that all of the above will be delivered in a continuously timely manner with the <br />timetable of the project held foremost. As you may know, Wightman Petrie, Inc. guarantees the <br />best possible product provided in the most efficient manner and accordingly will strive to reduce <br />costs wherever possible. Wightman Petrie will only bill for hours worked and will detail all <br />services provided as the project progresses. <br />If the above is acceptable to you, please sign below and return one signed copy of this letter. <br />Upon receipt of these items work can begin at your direction. <br />Once again, thank you for considering Wightman Petrie, Inc. <br />Sincerely, <br />Eric Zell <br />Enviro tal Department Manager <br />I:\Proposals\City of South Bend\Fred's Transmission & Clutch\Proposal <br />3_25_10.doc <br />This proposal (ASBESTOS INSPECTION, ENVIRONMENTAL ASSESSMENT, <br />PREPARATION OF DEMOLITION SPECIFICATIONS, DEMOLITION CONSTRUCTION AND <br />INSPECTION ENGINEERING SERVICES FOR FRED'S TRANSMISSION ~ CLUTCH <br />LOCATED AT 507 W. WESTERN AVENUE, SOUTH BEND, IN 46601 FOR ANOT-TO- <br />EXCEED FEE OF $27,220.00) is hereby accepted and authorization to proceed hereby granted: <br />Accepted By: <br />Date: <br />Printed name and title: <br />
The URL can be used to link to this page
Your browser does not support the video tag.