My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/1925 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1925
>
05/19/1925 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:47:06 AM
Creation date
4/5/2018 12:55:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/19/1925
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract with H. W. Reed & Sons Construction Company as provided <br />in Improvement Resolution No. 1448 adopted March 3rf.9' 1925 signed and construction <br />bond .attached thereto in the sum of $79758.00 with the United States Fidelity & <br />Guaranty Cmpany of Balitmore,.Md. as sureties, approved. Contract and bond ordered <br />filed. <br />Contract with Highways Immprovement,Company for grade, curb and valk <br />on Angella Avenue from alley west of Iroquois Street to St. Joseph Rivers Marquette <br />Avenue from Parkovash Avenue to Angelle.Avenue, and Ostemo Avenue from East Tina of <br />lot 91 North Shore Terrace Addition to Marquette Avenue as provided in: improvement <br />Resolution No, 1466 ado "I,ed April 7th., 1925 signed snd construct on bond att;achec <br />thereto in the sum of 6,389.90 with the Columbia .Casualty Company as sureties,. <br />approved Contract and bona ordered filed. <br />•Contract with Indiana Construction Company for hrade and walk on. <br />Eddy Street from Jefferson' Street to Fly. line of Grand Trunk Western Rt R. righT of <br />way as provided in improvement Resolution No. 1481 adopted April 21st., 19275,signed and <br />construction bond attached thereto in the sum of $309.00 with the Eagle Indemnity <br />Company of Cook County, Illinois as suretias approved. Contract and bond ordered filed, <br />Contract with C, E. Reesh for pipP sewer on Franklin Street from <br />Doruild Street to a point 12 feet, south of the south line of the alley north of <br />Ewing Avenue, as provided in improvement Resolution No.'1452 adopted March 24t,h. <br />1925 signed and construction bond attached thereto in the sum of S827.00 with the <br />Aetna Casualty & Surety Company as sureties, approved. Contract and bona ordered filed. <br />Contract with C. E. Reesh for pipe sewer oh Van Buren Street from <br />Saneoma_Avenue to the west, line of lot 11 John L. Taylor's Addition, as provided <br />in improvement Resolution No.•1454 adopted March 25th.9 1925 signed and construction <br />bond thereto attechedin the stjm of $510.00 with The Aetna Casualty Company as 4ureties, <br />approved. Contract and bond ordered fled. <br />Contract with L. H. Webster for pipe sewers on Madison Street; from the <br />alley west of SunnysiO.Ave. to Palmer Blvd. also Palmer Blvd. from Madison Street <br />to the east lime of lot 21 in Madison Street Park Addition, 'Also Madison Street from <br />Palmer Blvd. to a point 40 feet east, of the east line of lot 36 in North Sunnyside <br />Addition in Madison Park in the. City of S+auth Bend as provided in Resolution No. 1482 ; <br />adopted April 21st.9 1925 with construction bond attached thereto in the sum of <br />$3,113.00 with the Hartford Accident and Indemnity Company as sureties approved. <br />Bond and oontract•ordered•filed. <br />•Contract -with E. T. Tranberg for grade, curb and walk on Huey Street <br />from Lincoln Way West to the alley south of Frederickson Street as provided in <br />Resolution No. 1453 adopted March 24th., 1925 signed, with construction bond. <br />attached thereto in the sum of $816.00 with the American Employer's Insurance <br />Company of Boston, Mass as•sureties approved. Contract and bona ordered filed. <br />Contract with E. T. Tranberg for grade, curb and walk on.,Huiy <br />Street r�Linden,Avenue to Kenwood Avenue as provided in imrvement Resolution <br />No. 1455 adoptia March• Nth., 1925 signed and construction bond in the soar of <br />9185,00 with the American Employer's Insurance Company of Boston , Mass as sureties <br />approved. Contract and bond ordered filed. <br />Contract with- Wm. H. Burke for water connections on Michigan <br />Street from Bronson Street to Broadway under improvement Resolution No. 1477 <br />adopted April 15th.9 1925 signers and contract ordered filed. <br />Contract with Wm. H. Burke for eater connections on Altgeldt <br />Avenue from Miami Street to Marine Street under Improvement Resolution No. 1476 <br />adopted April 15th.9 1925 signed and contract ordered filed. <br />IMPROVEMENT RESOLUTION NO. 1501 Water and sewer gas connections on <br />Cherry Street from Jefferson Blvd. to a point 10 feet north of intersection of West <br />line of Cherry Street with Nly line of New York Central R. R. adopted, reading <br />as follows:- ( Insert see files.) Adopted and filed. _ <br />IMPROVEMENT RESOLUTION NO. 1502. Water, sewer and gas connections On <br />Rabinson Street Central R: R. indaz adopted- r*&dtng <br />as follows:- ( Insert see files.) adopted and filed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.