1924. Continued, <br />426 <br />B id of the White Constr. . Co. <br />Walk per sq. ft, a <br />$.20 <br />Curb per lin ft <br />.50 <br />Grading per cu. yd. <br />•90 <br />Sheet asphalt using Mexican per sq. yd. <br />2.71 <br />= sheet asphalt using Max Trinidad per sq. yd. <br />2.85 <br />2.60 <br />Asph. Concrete grinidad per sq. yde <br />2•46 <br />Asph, Cnnerete Mexican per sq. yd. <br />an <br />8 4nah conduit pipe per "lin ft. <br />Storm water inlets, each <br />12.5© <br />Marginal curb per lin ft. <br />?esetting inlets and manhole "covers, each <br />.40 <br />3.00 <br />Bid of Northern Constr, Co. <br />1.00 <br />Grading per ell. yd. <br />2.60 <br />Veedersburg, Brick ,3 inch per sq. yd. <br />6 inch .gravel base sand filler <br />sq. <br />2.75 <br />6 inch gravel base asphalt filler per yd. <br />sq. <br />3.555 <br />6 inch concrete base asphalt filler per yd. <br />Marginal curb per lin ft. <br />.40 <br />3.00 <br />Resetting inlets, each Check $100.00 <br />" <br />Bid of Reith Ritley Constr. Co. <br />Walk per sq. ft. <br />' 0 <br />" Curb per' lin ft. <br />060 <br />.1.00 <br />Grading per cu. yd. <br />Sheet asphalt Trinidad per sq. yd. <br />2.96 <br />Sheet asphalt Mexican per sq. yd. <br />2.75 <br />3 inch Veedersburg Brick on gravel base <br />2.55 <br />sand filler per sq. yd. <br />3 inch Veedersburg Brick on gmvgtxbzxe Concrete <br />2.80 <br />Concrete pavement per sq. yd. <br />sq. <br />40 <br />2.65 <br />Trinidad asph, concrete pavement per yd. <br />" sq. <br />2.45 <br />Mexican asph, concrete pavement per yd. <br />8 inch conduit pipe per lin fIA. <br />11.00 <br />Storm avatar inlets, each <br />.00 <br />Marginal curb per lin ft. <br />Resetting inlets and manhole covers, each <br />.40 <br />3.00 <br />PAVEMENT.ON TAYLOR STREET. <br />Bich of Northern Constr. Co. <br />.Grading per cu. yd. 1.Oi3 <br />Veedersburg 3 inch vitrified brick on gravel 2.60 <br />base sand filler per sq. yd. <br />6 inch gravel base asphalt filler per sq. 2.75 <br />6 inch concrete base asphalt filler per sq. 3.55 <br />8 inch conduit pipe per lin ft. 0 <br />Storm water inlets, each 12.50 <br />Resetting manholes and inlets, each 3.00 <br />Check $4 71.00 <br />Pavement on Taylor Street. <br />Bid of Bryant Smelser Company. <br />_ Veedersburg 3 inch Vertical Fibre on 6 inch <br />Gravel Base with sand filler per sq. yd. <br />Same with asphalt filler <br />e inch conduit pipe per lin ft. <br />Storm water inlets, each <br />Resitting inlets each <br />Resetting manhole covers, each <br />Chack$4 71.00 <br />$2.64 <br />2.79 <br />1.00 <br />15.00 <br />3.00 <br />3.00 <br />