My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/27/1924 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1924
>
05/27/1924 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:23:38 PM
Creation date
4/3/2018 1:43:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/27/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
422 <br />Tuesday May 2 th., 1924. Continued, <br />PAVEMENT ON DUNHAM STREET Continued. <br />Bid of W. J. Nees Co. <br />Curb per lin ft. <br />$.50 <br />Grading per cu. yd, . <br />Igo. i* three inch wire out Veedersburg <br />.80 <br />Block with Bituminous filler per sq. yd. <br />•2.7 <br />With sand -filler <br />2.64 <br />8 inch conduit pipe per.lin,ft. <br />1400 <br />Storm water inlets, each <br />13.00 <br />Marginal curb per lin ft. <br />-40 <br />Resetting inlets, each <br />3.00 <br />Resetting mar,1 ole covers, each <br />3.00 <br />Bid of The White Constr. Co.. <br />Walk per sq. ft. <br />.20 <br />Curb per lin ft. <br />.50 <br />Grading per cu. yd. . <br />Sheet asphalt Mexican per sq.. yd. - <br />2.91 <br />Sheet asphalt Trinidad per sq. yd. - <br />2.85 <br />e inch conduit pipe per-lin-ft <br />�90 <br />Storm water inlets, each <br />12.50 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers; each . <br />3.00 <br />.Marginal curb per lin ft; <br />.40 <br />Bid of Bryant $melser Constr. Co. <br />.Walk per seq. ft. <br />.20 <br />Curb per lin ft. <br />Veedersbur�g•3 inch Vertical Fibre <br />.050 <br />on six i;noh gravel base sand filler per sq. <br />yd._2.65 <br />Sand with asphalt filler per sq. yd. <br />2.80 <br />. 8 inch conduit pipe per lin ft. <br />1.00 <br />Storm water inlets, each • <br />15.00 <br />Marginal•eurb per lin ft. <br />.40 <br />Resetting inlets and manhole each <br />3.fl0 <br />. Check $544.00 <br />Bits of P1ummbv Constr. Co. <br />Curb per lin ft. <br />.50 <br />Grading per cu. yd. <br />1.00. <br />3 inch Veedersburg Vertical Fibre wire out <br />gravel base with sand filler per sq. yd. <br />2155 <br />For asphalt filler add <br />.15 <br />Concrete pavement per sq. yd. <br />2.25 <br />8 inch conduit pipe per lin ft. <br />.90, <br />Storm water inlets, each <br />12.50 <br />. Marginal curb per lin ft. <br />.35 <br />. Resetting inlets and manholes each <br />3.00 <br />Pavement on Carroll Street. ` <br />Bich of Plummer, Cntr. Co. <br />Grading per cu. yd. 1.00 <br />. 3 inch Veedersburg Vertical Abre Wire <br />Cut gravel base sand filler per sq. yd. 2.60 <br />For asphalt filler add per sq. yd. .15 <br />Concrete pavement per sq. yd. 2.32 <br />• Marginal curb per lin ft. .35 <br />Resetting inlets and manhole covers, eAch 3.00 <br />Check -S1Q0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.