Laserfiche WebLink
422 <br />Tuesday May 2 th., 1924. Continued, <br />PAVEMENT ON DUNHAM STREET Continued. <br />Bid of W. J. Nees Co. <br />Curb per lin ft. <br />$.50 <br />Grading per cu. yd, . <br />Igo. i* three inch wire out Veedersburg <br />.80 <br />Block with Bituminous filler per sq. yd. <br />•2.7 <br />With sand -filler <br />2.64 <br />8 inch conduit pipe per.lin,ft. <br />1400 <br />Storm water inlets, each <br />13.00 <br />Marginal curb per lin ft. <br />-40 <br />Resetting inlets, each <br />3.00 <br />Resetting mar,1 ole covers, each <br />3.00 <br />Bid of The White Constr. Co.. <br />Walk per sq. ft. <br />.20 <br />Curb per lin ft. <br />.50 <br />Grading per cu. yd. . <br />Sheet asphalt Mexican per sq.. yd. - <br />2.91 <br />Sheet asphalt Trinidad per sq. yd. - <br />2.85 <br />e inch conduit pipe per-lin-ft <br />�90 <br />Storm water inlets, each <br />12.50 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers; each . <br />3.00 <br />.Marginal curb per lin ft; <br />.40 <br />Bid of Bryant $melser Constr. Co. <br />.Walk per seq. ft. <br />.20 <br />Curb per lin ft. <br />Veedersbur�g•3 inch Vertical Fibre <br />.050 <br />on six i;noh gravel base sand filler per sq. <br />yd._2.65 <br />Sand with asphalt filler per sq. yd. <br />2.80 <br />. 8 inch conduit pipe per lin ft. <br />1.00 <br />Storm water inlets, each • <br />15.00 <br />Marginal•eurb per lin ft. <br />.40 <br />Resetting inlets and manhole each <br />3.fl0 <br />. Check $544.00 <br />Bits of P1ummbv Constr. Co. <br />Curb per lin ft. <br />.50 <br />Grading per cu. yd. <br />1.00. <br />3 inch Veedersburg Vertical Fibre wire out <br />gravel base with sand filler per sq. yd. <br />2155 <br />For asphalt filler add <br />.15 <br />Concrete pavement per sq. yd. <br />2.25 <br />8 inch conduit pipe per lin ft. <br />.90, <br />Storm water inlets, each <br />12.50 <br />. Marginal curb per lin ft. <br />.35 <br />. Resetting inlets and manholes each <br />3.00 <br />Pavement on Carroll Street. ` <br />Bich of Plummer, Cntr. Co. <br />Grading per cu. yd. 1.00 <br />. 3 inch Veedersburg Vertical Abre Wire <br />Cut gravel base sand filler per sq. yd. 2.60 <br />For asphalt filler add per sq. yd. .15 <br />Concrete pavement per sq. yd. 2.32 <br />• Marginal curb per lin ft. .35 <br />Resetting inlets and manhole covers, eAch 3.00 <br />Check -S1Q0.00 <br />