Laserfiche WebLink
Tuesday April 15, 1924. Continued. <br />Bid of r7ith Riley Construction Co.: <br />Cement k per s� ft <br />,60 <br />• Curb per lin ft <br />1.00 <br />Gracing per cu yd <br />Sheet asphalt, Mexican Oil, per sq yd <br />' <br />2.6 <br />T r inida d <br />2.65 <br />Veadersburg brick, sand filler, sq, yd <br />bituminous filler, gravel base,.por s- yd <br />2.80 <br />2.40 <br />Goncrete pavement per sq yd <br />sq <br />Asphaltic concrete, Mexican Oil, per yd <br />2.69 <br />Trinidad <br />1.00 <br />8 in conduit per lin ft <br />15.fl0 <br />Storm water inlets each <br />.40 <br />Marginal curb per lin ft <br />3.00 <br />Reset inlets each- <br />3.00 <br />• manholes <br />Certified check '230.00 <br />Bid of Plummer Construction Co.: <br />.50 <br />Curb per lin ft <br />1.00 <br />Grading per cu yd rival base, sand <br />in vertical fibre Veedersbura brick, g <br />sq <br />53 <br />2..53 <br />filler.per yd <br />15 <br />Asphalt' �f iller, add per sq yd <br />2.90 <br />roiierete pave- iti, per <br />1.00 <br />8 in conduit per lin ft <br />12.50 <br />,corm water inlets complete <br />5 <br />Marginal -crrb per lin ft <br />3.00 <br />Resetting inlets each <br />3.00 <br />manhole covers <br />Certified check $230.00 <br />Bid of W. .T. Lang Construction CO.: .85 <br />Granding per cu yd 2.71 <br />Sheet-Aspb3lt , Mexican Oil, per sq yd .15 <br />If Natural Lame is used add per sq yd 2.51 <br />Mexican, per sq yd 1.50 <br />Asphaltic Concrete, <br />Curb stretcher block par lin ft .SO <br />e in conduit pipe per lin ft 25.00 <br />Storm water incest complete 5.00 <br />Resetting inlets each 5.00 <br />manhole covers <br />Certified check 51230.00 <br />Bid of Northern Construction Co.: .55 <br />Cement curb per lin ft 1.00 <br />Grading per cu yd 2.65 <br />t Veedersbur-• 3 in vitrified brick per sq yd <br />in gravel base, sand filler, p 2.80 <br />6 in gravel base asphalt filler per sq yd <br />3 60 <br />6 in concrete base g.sphal't'filler per sq y d .9® <br />a in conduit pipe per lin ft 12.50 <br />Si.orm water inlets each .45 <br />Marginal.curb per lin ft 3.00 <br />Reset inlets each 3.00 <br />manholes <br />Certified check -1230.00 <br />Bids onpavement on Fisher Street from Harris Street to second alley west of <br />Harris Street, as follows: <br />The White 'onstruction Co.: .20 <br />Sidewalk per sq ft .50 <br />Curb per lin ft .85 <br />Grading per cu yd 2.68 <br />.Shut asphalt, Mexican, per sq yd 2.82 <br />Trinidad Natural Lake 2.43 <br />.ASPHALTIC CONCRETE, MexicAn, per sq yd 2.57 <br />Trinidad .85 <br />8 in conduit per lin ft 12.50 <br />'Storm water inlets each 0 <br />• Ma�rgina,l curb per lin ft .00 <br />.Reset inlets each 3.00 <br />manholes <br />Certifies cheek 3107.00 <br />