Laserfiche WebLink
r <br />Tuesday April 15, 1924. Continued. <br />Bid: of Reith Riley Construction Co.: <br />Sidewalk per square foot <br />Curb per lineal. _-foot ' <br />Grading per cubic yard <br />Sheet asphalt pavement, Mexican, per square yard <br />Trinidad <br />Veedersb2*9bi@?end filler, per square yard <br />Veedersbufg brick, bitum filller,.gravel base, per sq yd <br />Concrete pavement, per square, yard <br />Asphaltic concrete, Mexican,. per sq yd <br />Trinidad <br />8 inch conduit per lineal foot <br />Storm water inlets each <br />Marginal curb per lin ft <br />Resetting inlets each ' <br />Resetting manholes each <br />Certified check t400.00 <br />Bid of Plummer Construction Co., <br />Curb per lin ft <br />Grading per cu yd <br />3 inch vertical fibre Veedersburg brick, gravel base, sand <br />filler, per sq yd <br />Asphalt filler, additional per sq yd <br />• Concrota pavement per sq yoOd <br />8 in conduit per lin ft <br />Corm water inlets eAch <br />Marginal curb per lin foot <br />Resetting inlets each <br />Resetting manholes each. <br />Certified check -1400.00 <br />Bid of Lang Construction Xol: <br />Grading per eu yd <br />Sheet asp, Mex, per sq yd <br />For Natural Lake add per sq yd <br />Asp con using Mex, per sq yd <br />• Curb stretcher block per lin ft <br />8 in conduit per lin ft <br />Storm water inlets each <br />Marginal curb per lin ft <br />Resetting inlets each <br />Reset Manholes each <br />Certified check S400.00 <br />Bid of Northern Constructinn Co.: <br />Cement curb per lin ft <br />Grading per cu yd <br />VEEDERSBURG 3 in vitrified brick, 6-`-in gravel base, sand <br />filler, per sq yd <br />Same, 6 ire filler ,per sq fret <br />• Smmme 6 in eoA rete base, asphalt filler, per sq yd <br />• 8 in conduit pipe per lin ft <br />Storm zTater inlets each <br />• Marginal curb per lin ft <br />• Resetting inlets each <br />Resetting manholes i%oh <br />• Certified check D400.00 <br />.20 <br />.60 <br />1.00 <br />2.79 <br />2.99 <br />2.65 <br />2,80 <br />2.40 <br />2.49 <br />2.69 <br />1.00 <br />15.00 <br />.40 <br />3.00 <br />3.00 <br />.50 <br />1.00 <br />2.60 <br />.15 <br />2.40 <br />1.00 <br />12.50 <br />35 <br />3.00 <br />3.00 <br />.85 <br />2.71 <br />.15 <br />2.51 <br />1.50 <br />.80 <br />25.00 <br />.30 <br />5.00 <br />5.00 <br />.55 <br />1.00 <br />2.65 <br />2.80 <br />3.60 <br />.,go <br />12.50 <br />.40 <br />3.00 <br />3.00 <br />Bids on pavement on Peorge Avenue from Sample Street to the alley'at the <br />northerly end of George Avenue; also, alley from northerly end of George Avenue to <br />Marietta Street, a.s follows: <br />• Bich of White Construction Company: <br />Side,,A» lk per sq ft 20 <br />Curb per lin ft .50 <br />. Grading per ou yd .85 <br />Sheet asphalt, Mexican, per sq yd 2.68 <br />Trinidad 2.82 <br />Asphaltic concrete, Natural Lake Trinidad, per sq yd 2.57 <br />Mexican 2.43 <br />8 in conduit pipe per lineal ft .85 <br />Storm water inlets each 12.50' <br />Marginal curb per lin ft .3.0 <br />Reset inlets each 3.00 <br />manholes 3.00 <br />Certified check 3230.00 <br />