My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/15/1924 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1924
>
04/15/1924 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:29:15 PM
Creation date
4/3/2018 10:54:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/15/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
25h <br />Tuesday April 15th, 1924. Continued. » - <br />The following bids on pavement of Victoria Street from -Miami Street to <br />a point 88 feet west of High Street: <br />BId of Williston Construction Company: <br />Curb per lineal foot <br />.50 <br />Grade per 60,ja I y6rd-'J <br />,95. <br />Sheet asphalt pavement, Mexican, per square yard <br />' <br />2.67 <br />Asphalt concrete, Mexican, per square yard <br />' <br />2.42 <br />8-inch conduit per line€& foot <br />.85 <br />" Storm water inlets each <br />14.00 <br />Marginal curb per lineal foot <br />.40 <br />Resetting inlets Bach <br />3.00 <br />Resetting manholes each <br />3.00 <br />Certified check $450.00 <br />Aid of White Construction Company: <br />' <br />SidewAlk per square foot <br />.20 <br />Curb per lineal foot <br />. 50 <br />Grading per cubic yard <br />.50 <br />Sheet asphalt, Mexican, per square yard <br />2.85 <br />Trinidad <br />2.82 <br />Asphaltic Concrete, Trinidad, per square yard <br />2.82 <br />57 <br />Me-xican <br />43 <br />2..43 <br />• 8 inch conduit! per lineal foot <br />» Storm water inlets etch <br />12.50 <br />Marginal curb per lineal foot <br />.30 <br />Resetting inlets each <br />0 0 <br />33.. <br />Resetting manholes each <br />00 <br />Certifier check $450.00 <br />• <br />Bid of Rieth Riley Construction Company: <br />Cement walk per square fo&t <br />Cement curb per lineal foot <br />;EO <br />Grading per cubic yard <br />1.0 <br />° Sheet asphalt, Mexican, per square yard <br />2.79 <br />' Trinidad <br />2.89 <br />Veedersburg brick, sand filler, per square yard <br />2.65 <br />° bituminous filler, gravel base <br />2.80 <br />• Concrete pavement per square yard - <br />2.40 <br />Asphaltic Concrete, Mexican, per,square yard <br />2.49 <br />Trinidad <br />2.69 <br />8 inch conduit per lineal foot <br />1.00 <br />- Storm water inlets each <br />15.00 <br />» Marginal curb per lineal foot <br />.40 <br />Resetting inlets each <br />3.00 <br />Resetting manholes each <br />3.00 <br />Certified check U45�.00 <br />Bid of Plummer Construction Company: <br />• Grading per cubic yard <br />1.00 <br />3 inch Vortical fibre Vaedersburg brick, gravel base,,sand <br />filler per square yard <br />2.55 <br />Concrete pavement per square yard <br />2.40 <br />8 inch conduit per lineal foot,, <br />1.00 <br />Storm water inlets complete <br />12.50 <br />Marginal curb per lineal foot <br />.35 <br />. Resetting inlets each <br />3.00 <br />Resetting manholes each <br />3.00 <br />Certified check $450.00 ' <br />• Bid of W. J. Lang Construction Company: <br />Grading per cubic yard <br />.85 <br />Sheet asphalt, Mexican, per square yard <br />2.71 <br />» If Natuarl Lake asphalt is used add per square yard <br />.15 <br />• Asphaltic Concrete, Mexican, per square yard <br />2.51 <br />8 inch conduit pipe per lineal foot <br />.80 <br />• Storm water inlets each <br />25.00 <br />• Resetting inlets each <br />5.00 <br />• Resetting manholes each <br />5.00 <br />• Certified check 1450.00 <br />Bias an Jefferson street pavement from Lafayette Street to Taylor Street <br />as follows: <br />Bid of White Construction Company: <br />• SidewAlk per square fo6t 20 <br />• Curb per lineal foot .50 <br />Grading per cubic yard 3.00 <br />Sheet asphalt pavement, Mexican, per square yard 2.68 <br />- F Trinidad Natural Lake 2.82 <br />Asphaltic concrete pavement, Trinidad Natural Lake per sq yd 2.57 <br />Mexican 2.43 <br />8 inch conduit pipe per lineal foot .85 <br />Storm water inlets each 12.50 <br />Marginal curb per lineal foot ,30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.