Laserfiche WebLink
Tuesday ApOl 15, 1924. continued. <br />The following bids were received on Corby Street=from St. Louis <br />Boulevard to <br />South Bend Avenue <br />Bich of W. J. Lana Construction Company: <br />.85 <br />Grading per cubic yard <br />square <br />2.11 <br />Sheen asphalt, Mexican, per yard <br />Natural Lake, add <br />.l5 <br />2.30 <br />,phaltic concrete, Mexican, per square foot <br />.51 <br />8 inch conduit pipe per lineal foot <br />25.00 <br />Storm eater inlets each -. <br />•30 <br />Marginal curb per lineal foot <br />5.00 <br />Resetting inlets each <br />5.D0 <br />Resetting manholes each <br />Certified check $561.00 <br />Bid of White Construction Company: <br />.20 <br />Walk per square foot <br />.50 <br />Curb per lineal foot <br />.85 <br />Grading per cubic yard <br />square yard <br />2.68 <br />Qheet asphalt pavement, Mexican, per <br />2.82 <br />Trinidad. <br />Asphaltic Concrete pavement per square yard, Trinidad <br />2.57 <br />2.43 <br />Mexcan <br />8 inch conduit pipe per lineal foot <br />.85 <br />12.30 <br />Storm water inlets each <br />0 <br />Marginal curb per lineal foot <br />3.:000 <br />Resetting inlets each <br />3'D0 <br />Resetting manholes each <br />Certified check $561.00 <br />Bid of Williston Construction Company <br />Cement curb per lineal fo&t <br />.50 <br />980 <br />_ Grading per cubic yard <br />2.67 <br />aheet asphalt, Mexican, per square yard <br />2.42 <br />Asphaltic Concrete, Mexican, per square yard <br />85 <br />8-inch conduit pipe per lineal fool, <br />•00 <br />14. <br />Storm water inlets each <br />.40 <br />Marginal curb per lineal font <br />3.00 <br />Resetting inlets each <br />3..00 <br />• Resetting manholes each <br />• Certified check $561.00 <br />Bid of Reith Riley Construction Company: <br />.20 <br />Walk per square foot <br />.60 <br />" Curb per lineal foot <br />1.00 <br />Grading per cubic yard <br />square <br />2.79 <br />° Sheet asphalt, Mexican, per yard <br />99 <br />Trinidad <br />Veedersburg brick, sand filler, per square yard <br />2.60 <br />2.0 <br />bituminous filler <br />2.40 <br />° Concrete pavementper square yard <br />square <br />49 <br />2.69 <br />Asphalt concrete, Mexican, per yard <br />Trinidad <br />1.00 <br />8 inch conduit per lineal fool, <br />15.00 <br />Storm water inlet each <br />• Marginal curb per lineal foot <br />.40 <br />3.00` <br />Resetting inlets each <br />3.00 <br />Resetting manholes each <br />Certified check $561.00 <br />Bid of Northern Construction Company: <br />1.00 <br />Grading per cubic yard <br />• Veedersburg brick, 5 inch vitrified <br />6 inch gravel base, sand filler per square yard <br />2.65.. <br />6 inch gravel base, asphalt filler <br />2.80 <br />3•60 <br />6 inch concrete base, asphalt filler <br />.90 <br />• 8 inch conduit per lineal foot <br />12.50 <br />Storm water inlets each <br />.50 <br />Marginal curb per lineal foot <br />3.00 <br />Resetting inlets each <br />3.00 <br />Resetting manholes each <br />Certified check $561.09 <br />Bid of Plummer Construction Company: <br />1.00 <br />Grading per cubic yard ravel base send <br />3 inch vertical fibre Veedersburg brick, g <br />• filler, per square yard <br />2.55 <br />" For asphalt filler acid per square yard <br />.15 <br />2 <br />° Concrete pavement per square yard <br />•- <br />.' 00 <br />a Ina sondult pt'r hnww 1 toot <br />12.50 <br />Storm water inlets Complete <br />.35 <br />Marginal curb per lineal foot <br />3.00 <br />" Resetting inlets each <br />3•00 <br />Resetting manholes each <br />Certified check 561.00 <br />