My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Berlin Place No 2 Electrical Mechanical & Plumbing Div A Project No 117-048R - CBS Services LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No. 1 - Berlin Place No 2 Electrical Mechanical & Plumbing Div A Project No 117-048R - CBS Services LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 10:20:10 AM
Creation date
3/28/2018 2:52:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ej SER VI CE'T LF L C <br />5005 Lincoinway E- STEA-Mishawaka, Indiana 46544 <br />Office (574) 329-5191 Fax (574) 329-5471 <br />March 15, 2018 <br />72 HOUR NOTICE: <br />CBS Service's contract with City of South Bend includes completion dates. These dates have <br />been pushed back by no fault of CBS. These delays have continued to date. On 03/14/2018 a <br />letter was written to TWG stating that any further delay will cause additional burden as labor, <br />storage, and material prices rise. Additionally, the manpower and finance were secured per <br />contract schedule. CBS cannot continue to carry the burden of rising costs and shifting <br />manpower, or lengthened general conditions. We have notified TWG that our start date will be <br />Monday 3/19/2018. If we are told not to start, we will request additional compensation. If any re- <br />work or additional trips to finish work are required due to incomplete predecessor activities, we <br />will request additional compensation. If any re -work lis needed due to added framing or weather - <br />damaged product, we will seek compensation. If additional protection is needed due to weather <br />exposure, we will seek compensation. <br />Action Items that are causing delay and/or damages: <br />1. Framing on building is not complete. Items remaining but not inclusive are knee walls <br />kitchen islands and peninsulas, corrected framing including P-lam beam reframe, punch <br />framing, electrical panel and media panel box outs. Framing to have been completed 12-29- <br />17 <br />2. The roof has not been installed on Building 2 along with several windows and doors. Any <br />work performed that is damaged by the building not being dried in will be at the cost of others. <br />Any additional protection on the work installed will be at the cost of others. Roofing to be <br />completed 2-26-18 Windows to be completed 1-12-18 <br />This Notice does not waive any right of extension for delay, or compensation from previous <br />dates not being met. <br />P,M" smca , <br />CBS Service LLC <br />An Equal Opportimity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.