My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Berlin Place No 2 Electrical Mechanical & Plumbing Div A Project No 117-048R - CBS Services LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No. 1 - Berlin Place No 2 Electrical Mechanical & Plumbing Div A Project No 117-048R - CBS Services LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 10:20:10 AM
Creation date
3/28/2018 2:52:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2, The Contractor shall apply for and obtain any and all required permits for the work from <br />local, state, and federal agencies and shall comply with permit requirements, including the <br />St. Joseph County / City of South Bend Building Department. <br />3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the <br />Contractor shall provide the City with proof that the Contractor is duly licensed, qualified <br />and registered with the Secretary of State of Indiana to engage in business within the State <br />of Indiana. <br />4. The Contractor shall comply with all provisions of Indiana Code 5-116-13, as amended. The <br />City reserves the right to immediately terminate the public work project awarded should the <br />Contractor be found to be in violation of any provision: of Indiana Code 5-16-13 and such <br />violation shall result in the forfeiture of Contractor's performance bond to the City. <br />XIII. SUBMITTALS <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 106 <br />B. Additions: <br />1. Submit four (4) copies or an electronic version of the submittals for all equipment or <br />materials used in this project to the City for approval. All submittals must be delivered <br />within 7 calendar days from the notice to proceed. <br />a, Digital submission of all submittals shall also be provided to TWG Construction, LLC <br />at time of submission. <br />2. The Department of Public Works will review and return two (2) copies or an electronic <br />version of the submittals within five (5) working days. <br />3. The review of the submittal information by the Department of Public Works is to facilitate <br />the satisfactory acceptance of the equipment. This review shall ineither relieve the <br />contractor from the responsibility for deviations from the Specifications, nor from errors and <br />omissions in the shop drawings or literature. Parts found not meeting the requirements of <br />these Specifications shall be removed, repaired or replaced at no cost to the City. <br />4. Submittals shall include complete manufacturer's descriptive information and shop <br />drawings for all the parts furnished under this contract. <br />5. Upon completion of project, the Contractor will supply one (1'1) conformed set of all <br />submittals to the City and TWG. <br />XIV. PR ,�ITIQN AND PROGRES&,, <br />TOS,EC _ <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Sec. 108 <br />B. Additions: <br />I The project will have a completion date of May 23rd , 2018 for Building 2, June 91h , 2018 <br />for Building 1, June loth, 2018 for Building 3, and August 14 th for Building 4. The contract <br />time will start when the Notice to Proceed is delivered andl signed, <br />2. The City, Engineer, Contractor, and Td G Construction, LLC will hold a pre -construction <br />meeting following award of the contract. The date of the Notice to Proceed will be agreed <br />at that meeting. <br />Version 4/17/2015 Special Provisions - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.