My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - A&Z Engineering LLC - Airport Annexation Area Sanitary Sewer Extension
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No. 1 to PSA - A&Z Engineering LLC - Airport Annexation Area Sanitary Sewer Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:23:12 AM
Creation date
3/28/2018 2:45:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C2.01 Compensation for Basic Services (other than Resident Project Representative) - <br />Lump Sum Method of Payment <br />A. Owner shall pay Engineer... Representative, if any, as follows: <br />1. A Lump Sum amount of $7-5,3450-$107,400 based on the following <br />estimated distribution of compensation: <br />g. Sanitary Server Design and Plans $31,950 <br />h. Geotchnieal ExPloral'ion for $11,800 <br />maximum 260f-t of boring (13-20ft bores) <br />. Potholing $9,800 <br />maximum of 4 potholes inclusive of permitting and. <br />maintenance of traffic costs. Any additional pothole beyond <br />a maximum of 4 potholes will incur $2200/ pothole plus <br />$1000 maintenance of traffic fee up to a maximum of 4 <br />potholes estimated to be completed each day. <br />B. Period of Service: The compensation amount stipulated in Compensation Packet <br />BC -I is conditioned on a period of service not exceeding 3 9 months. If such period <br />of service is extended, the compensation amount for Engineer's services shall be <br />appropriately adjusted. <br />Agreement Summary <br />a. Original Agreement amount: $53,850 <br />b. Net change for prior amendments: $0 <br />c. This amendment amount: $53 550 <br />d. Adjusted Agreement amount: $107;400 <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this <br />Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in <br />effect. The Effective Date of this Amendment is <br />OWNER: ENGINEER: <br />City of South Bend, IN <br />Board of Public Works A ) P V Q11v A&Z Engineering, LLC <br />lyd apt PIr list gym^ <br />By By: <br />Date Signed: ° „ T' Date Signed: 0 201 <br />city .. <br />ra✓vlaq.r ..v«^.rt-nM.:awKt.1vAM'JS <br />Page 2 <br />(Ex hihut K— (rAmcnalancut to Owner -Engineer Agrecinent) Attaclrnaent r) <br />EJ(:DC E-500.^A,greement Between awncr and Eaagincer for Professional services. <br />Copyright U 2008 National Society of Professionals Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.