<br />TUESDAY, AUGUST- 16, 1927 427
<br />Board met in regular session at 9:30 A. U, All members present. Miss
<br />Hazel A Turner, Clerk, absent.
<br />Minutes of meetings held August 9th and loth read and approved.
<br />Bids were received, opened and read for the construction of grade, curb and
<br />walk on the south side of Dommoyer Avenue from Michigan Street to Fellows Street,
<br />under Improvement Resolution No. 1930:
<br />concrete walk concrete curb grading to'sub -grade
<br />H. L, Davis & Son .16 sq ft ..40 lin. ft .40 cu yd
<br />Bids having been received for the grade, curb and walknon Doxmoyer Avenue
<br />from Michigan Street.to Fellows Street, the Board hereby awards the contract to
<br />H. L. Davis & Son on their low bid submitted.
<br />No petitions having been filed for a change of the type of pavement other than
<br />that specified in the preliminary order for the pavement on Amer Street from Freder-
<br />ickson Street to Dincoln way Nest, under Improvement Resolution No. 1882, the Board
<br />this 16th day.of august, 1927 hereby makes a final order for Sheet�Asphalt Heavy
<br />Traffic as the type of pavement with which said street shall be improved and awards
<br />the contract to the Williston Construction Company at their low bid of $9,917.60,
<br />this being the lowest and best bid presented. ./
<br />No petitions having been filed for a change of type of pavement other than
<br />that specified in the preliminary order for the poadwaytw&dening and pavement on
<br />Main Street from South curb line of Mayne Street to North curb line of Division Street,
<br />under improvement Resolution No. 1867, the Board thts,^t6th day of August, 1927, hereby
<br />makes a final order for Heavy Traffic Sheet Asphalt as tge type of pavement with which
<br />said street shall be widened and resurfaced and awards the contract to the Albert Con-
<br />strucyion Company at their bid of 6,696,56, this being the lowest and best bid pre-
<br />sented.
<br />!i No petitions -having been filed for a change of the type of pavement other that
<br />that spefified in the preliminary order for the pavement on Kenwood Avenue from Olive
<br />Street to Bendix Drive, under Improvement Resolution No. 1898, the Board this 16th day,
<br />! of August,m1927 hereby makes a final order for heavy traffic Sheet Asphalt as the type,
<br />of pavement with which said street shall be paved and awards the contract to the .filbert
<br />Construction Company at their low bid -of $17,312.20, this being the lowest and best bid.
<br />presented.
<br />No petitions having been filed for a change'of the type of pavement other than
<br />that specified in the preliminary order for the pavement an Van Buren Street from the
<br />I� C.S. & S.R.R. to Sancome Avenue, under Improvement Resolution No. 1884, the Board this
<br />16th day of August, 1927 hereby makes a final order for Light.Traffic Sheet Asphalt as
<br />j� the type of pavement with which said street shall be paved and awards the contract to
<br />the Rieth-Riley Construction Company at their low bid of $2,661.20, this being the
<br />lowest and best bid submitted.
<br />City Engineer, Mr. H. G. Wray, filed following partial estimates:
<br />Partial Estimate No. 1 for the pavement on McKinley Avenue from the East line of
<br />itSunnyside Avenue to the East line of Greenalwn Avenue in accordance with the terms of
<br />the contract between the City and the Williston Construction Co., under Improvement
<br />Resolution No. 1863. Board signed same in amount of $15,182.28
<br />Partial Estimate No. 1 for sewer on Kinyon Street fron Sherman Avenue to a point
<br />twenty feet (20t) West of the East line of Lot 186 Northwest Addition, innaccordance
<br />i with -the terms of the contract between the City and John F. Hipskind, under Improvement
<br />if Resolution No. 1851.
<br />City Engineer, Mr. H. G. dray, filed following primary assessment rolls:
<br />j Assessment roll for pavement on Colfax Avenue from Eddy Street to Sunnysid e Ave.
<br />under Improvement Resolution No. 1715. Amount Niue the contractor $16,617.64.
<br />Assessment for pipe sewer on Victoria Street fr&m Miami Street to the Southeast
<br />Trunk Sewer, under Improvement Resolution No. 1789. Amount due the contractor $4,529400
<br />Assessment f'oll for grade, curb and walk on Oliver Street from Donald Street to
<br />Ewing Avenue, under Improvement Resolution No. 1819. Amount due the contractor $1,987,5
<br />j Assessment roll f or grade, curb and walk on ey trw: rom Keller Street to
<br />' IMarr ueettte9�Avenue, under Improvement Resolution No. 1820. Amount due the contractor
<br />#3*098.
<br />Assessment roll for Grade, curb and walk on Liberty Street from Division Street
<br />to Jefferson Blvd., under Improvement Resolution No. 1822. Ampunt due $2,265.49.
<br />Assessmenr roll for grade, curb and walk on Lofts-8,Sreet from Division Street to
<br />Jefferson Blvd., under Improvement Resolution No. 1824. Amount due contractor
<br />• , � �1933«84. ,
<br />Assessment roll for grade, curb and walk on Falcon Street from ]Division Street
<br />to Jefferson Blvd., under Improvement Resolution No. 1826. Amount due the contractor
<br />2,39.97.
<br />
|