My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/07/1927 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1927
>
06/07/1927 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:43:49 AM
Creation date
3/15/2018 1:46:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/7/1927
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�55 <br />Tuesday, June 7th., 1927. <br />Boa-rd met in regular session at 9 A. 111. Mr. W. R. Hinkle absent. <br />Minutes of meetings held May 3lst., and June Ist., I927, read and ap <br />ed. <br />The Board approved the following excavation. bonds: <br />Excavation Bond for Rocco Simeri in the amount of $I,000.00 signed by <br />the Columbia Casualty Co. <br />cavation bond of a. V. Krillenberger in the amount of I,000.00 si <br />by the lvetropolitan Casualty Insurance Co. <br />The Board signed the contract with Rocco Simeri for the constuction of <br />a se,ier on Orange Street from College Street to a point 40 feet West of the East line <br />of Lot 24 College Grove Addition; ALSO from Brookfield Street to a point 169.5 feet <br />west of the center line of Brookfield; ALSO from Grant Street to the alley west of <br />O'Brien Street under Improvement Resolution No.I976. The Board also approved the <br />vonstruction bond of same in the amount of$3,235.70, which is I00 of the contract <br />j price signed by the Columbia Casualty Co., of New York. <br />•.The Board signed the contract with Rocco Simeri for the cons ruction <br />of a sewer on St Joseph Street from Broadway to a point 27 feet North of the South line <br />of Lot 51 in Haney's Add., under Improvement Resolution No.I852. The Board also approve <br />j the construction bond of same in the amount of $699.I0, which is I00% of the amount of <br />. the contract price, signed by the Columbia Casualty Co., of New York. <br />. City Engineer, Mr. H. G. 'ffrayy, filed plans, specifications and estimate <br />and the Board adopted a resolution for the construction of pavement on McKinley Avenue <br />from the East line of Sunnyside Avenue to the East line of Greenlawn Avenue under Impro- <br />vement Resolution No.I863. In the above matter, property owners waived all objections <br />on and in defense to any defect in said proceedings and to any violation in procedure <br />for the construction of street improvements as fixed by law. Whereupon the Board, <br />opened, received and read sealed proposals for the constrution of said improvement. Bid <br />are as follows: <br />Albert Const. Reith Riley <br />dilliston Const. <br />walk 122 .20 .20 <br />curb .50 .50 .50 <br />marginal curb .40 .40 .40 <br />curb and gutter .85 .80 .80 <br />grading I.05 I.I5 1.10 <br />sheet asphalt 2.80 2.82 2.77 <br />asphaltic concrete 2.68 2.72 no bid <br />storm water inlets I2.50 I2.50 I2.50 <br />resetting manholes 3.00 3.00 3.00 <br />resetting inlets 3.00 mo bid 3.00 <br />water connect. L.S. 34.00 33.50 34.00 <br />water connect. S. S. 27.50 28.00 27.50 <br />8 T' pipe I.00 I.00 I.00 <br />All _of the above bids handed to. City Engineer for tabulation. <br />In the matter of Improvement Resolution No.I835 for the construction of <br />a sewer along McKinley Avenue fromdest line of lot 58 Jefferson Park Addition to Green - <br />lawn Avenue, property owners waived all right of objection to proceed -are and to any viol <br />-# t6n in procedure for the construction of improvements as provided by law. `;thereupon <br />the Board proceeded 'to receive, open, and consider sealed proposals for the constructio <br />ij of said sewer along McKinley Avenue.under Improvement Resolution No.I835. Bids as <br />l "follows <br />'j Contractor <br />12 inch <br />8 inch <br />6 inch <br />Manholes Complte <br />1 Edward Di Julio <br />I.75 <br />.60 <br />.so <br />85.00 <br />yilliston Const. <br />I.80 <br />1.00 <br />I.00 <br />I00.00 <br />';, John F. Hipskind <br />2.20 <br />1.00 <br />I.00 <br />97.50 <br />Bids having been received for the construction of sewer on ��icKinley Aren <br />under Improvement Resolution No.I835, the Board this 7th., day of June, I927, hereby <br />awards the contract for said improvement to Edward DiJulio at his low bid of <br />City Engineer, Y-r. H. G. ;`Dray, filed plans, specifications and estimates <br />and the Board adopted resolutions for the following improvements: <br />Pavement on Frances Street from Sorin Street to South Bend Avenue under <br />Improvement Resolution No.I864. <br />Pavement on Yiner Street from Eddy Street to East line*Of Madison Park <br />Addition under Improvement Resolution No.I865. <br />Pavement on Twenty-sixth Street from Jefferson Blvd., to Mishawaka Avenu <br />under Improvement. Resolution No.I866. <br />!`! Pavement and widening of fain Street from the south curb line of Wayne <br />
The URL can be used to link to this page
Your browser does not support the video tag.