Laserfiche WebLink
0 <br />Tuesday May 3lst., 1927. <br />This being <br />the date set, bids <br />were received, opened and read <br />i <br />for the following Improvements: <br />Improvement <br />Resolution No.I8II <br />for the construction of <br />pavement <br />on Hoose Court <br />from Scott Street <br />to Chapin Street. <br />Bids as follows: <br />Contractor <br />concrete Asphaltic <br />Concrete <br />grading reset M.H. W.C.S.S. <br />S.S. <br />Hoban & Roach <br />2.10 <br />180 3.00 <br />23.00 <br />I9.06 <br />Alex Bukowski <br />2.00 <br />.70 3.00 <br />I7.50 <br />I7.50 <br />E.- T. Tranberg <br />2.I6 <br />.80 2.00 <br />27.00 <br />22.00 <br />Carl E. Zimmer <br />2.50 <br />1120 2.50 <br />32.00 <br />25.00 <br />Improvement <br />Resolution No.I804 <br />for the grade, curb and <br />walk <br />improvement on <br />2Ist., Street from the North line of <br />Christman Place Addition and <br />the <br />west 2 of 2Ist. , Street from the <br />North line of Christman <br />Place Addition to <br />the center <br />line of Washingtnn Avenue. Bids <br />as follows: <br />Contractor <br />walk curb <br />grading <br />J. A. Barnes <br />.16 .40 <br />.40 <br />E. T. Tranberg <br />.I51 .45 <br />.50 <br />Carl Zimmer <br />.152 .45 <br />.50 <br />Improvement Resolution No.I806 for the pavement of Sheridan Ave. <br />from the South line of the first alley south of Division Street to a point 82' feet <br />South. Bids as follows: <br />Contractor M. Curb Gr.Sheet Asphalt H.T. `later Conn. L. S. <br />Albert Const. .40 .60 2.60 35.00 <br />S. S. Sewer C. 8" pipe <br />25.00 I.50 I.00 <br />Improvement Resolution No.I803 for the pavement of Division St., <br />from the east line of Chicago to the east line of Belleville Third Unit. Bids as <br />"ollows: <br />Contractor :_ :Garb= ?.C. Curb grad. Sheet Resur. res. inlets reset. M. H. <br />Albert Co. .40 .50 .70 2.65 I.60 3.00 3.00 <br />Contractor `"later Oonn. L. S. S. S. 811 pipe sewer Conn. <br />Albert Co. 45.00 32.50 1.00 1.50 <br />Improvement Resolution No.I806 for the pavement of Sheridan Av <br />from the South line of the Ist., alley south of Division Street to a point 82' feet <br />South. Bids as follows: <br />Contractor 11. C. grad. Sheet Water C. 1. S. S. S. Sewer Conn. 8" pipe <br />Albert Co. .40 .60 2.60 35.00 25.00 I050 1.00 <br />All of the above bids handed to the City Engineer for tabulation. <br />This being the da''e set, hearing was had on the assessment roll <br />for the construction of sheet asphalt pavement on O'Brien Street from Elwood Street <br />to Keller Street under Improvement Resolution No.I747. <br />In the above matter, no remonstrators appeared and no written <br />remonstrance was filed and the Board, being fully advised in the premises, finds that <br />the several lots and parcels of land which have been assessed for said improvement <br />have been benefited in the amounts named on said roll. The Board therefore, takes <br />final action on said assessment roll, and declares same in all things ratified, con- <br />firmed and approved. The Board now orders said assessment roll delivered to the <br />department of Finance. <br />This being the date set, hearing was had on the assessment roll <br />for the construction of grade, curb and walk on O'Brien Street from the N.L. of Ellwo <br />Avenue to the S.L. of Keller Street; also Bulla Street and S.A Keller Street froll <br />the alley E. of O'Brien Street to alley W. of O'Brien Street under Improvement Resolu <br />ti on No.I745. <br />In the above matter, no remonstrators appeared and no written <br />remonstrance was filed, and the Board being fully advised in the premises, finds that <br />the several lots and parcels of land which have been assessed for said improvement <br />have been benefited in the amounts named on said assessment roll, The Board, therefo. <br />takes final action on said assessment roll and declares same in all things ratified, <br />confirmed and approved. The Board now orders said assessment roll delivered to the <br />Department of Finance. <br />City Engineer, Mir. H. G. Wray, filed plans, specifications and <br />estimates and the Board adopted the following improvement resolutions: <br />Improvement Resolution No.I860 for the pavement of O'Brien Stree <br />from Lincoln Way vest to Vassar Street. <br />Improvement Resolution No.I86I for the pavement of Sancome Av <br />from LaPorte Avenue to Lincoln Nay West. <br />Improvement Resolution No.I862 for the pavement of Turnock Stre <br />from South Bend Avenue to Corby Street. <br />f <br />• <br />0 <br />