Laserfiche WebLink
Tuedaay, March I5th., 1927. <br />BIB OF+ BYRNE BROS. <br />CONSTRUCTIONCCi IIi'ANY. <br />dHTCAGO ' <br />I7�LIN©IS. I <br />R MONOLITHIC <br />EENFORCED CONCRETE PIPE PRECAS'1. <br />REENFORCEll; .CONCREI.E <br />WITHOUT'R +D CLAY LIKERO WITH SF. C. <br />WITHOUT <br />WITH VITRIFIED ETC. <br />96* 6600 <br />74.40 <br />68.50 <br />i <br />75.90 <br />90" 80.35 <br />88.45 <br />81.50 <br />88.60 <br />84" 84,30 <br />93.15 <br />84.70 <br />91.55 <br />78 ft 64.-00 <br />70.60 <br />75.10 <br />78.70 <br />172" 59,00 <br />66.30 <br />63,00 <br />69,30 <br />69" 48,80 <br />54.60 <br />51,70 <br />59,00 <br />30,80 <br />36,70 <br />35.85 <br />40,75 <br />307 19.00 <br />27.10 <br />26,00 <br />30,40 � <br />27" 15,50 <br />I5.50 <br />15.50 <br />15.50 <br />24e1 8.00 <br />8.00 <br />8.00 <br />84.00 <br />I8n 5.00 <br />5.00 <br />5.00 <br />5.00 I <br />6" 3.00 <br />3.00 <br />3.00 <br />3.00 <br />Outlet complete I8,359.84 <br />I8,359 84 <br />I81359.84 <br />I80359.84 <br />Class A. M. A.2000'00 <br />200.00 <br />200.00 <br />200,00 <br />Class B. M. H 440.00 <br />440.00 <br />440.00 <br />440,00 <br />Class C. M H* 649. 74 ' <br />-649.. 74 <br />649.74 <br />649. 74 <br />Class A. Concrete 25000 <br />25.00 <br />25,00 <br />25.00 <br />Class`B Concrete I4.00- <br />14.00 <br />I4.00 <br />14,00 <br />i <br />Excavation 2.00 <br />2.00 <br />2.00 <br />2.00 <br />reenforeing steel .07 <br />.07 <br />.07 <br />..07 <br />timber piling 2.00 <br />2.00 <br />21,00 <br />2.00 <br />Timber Sheeting I00.00 <br />100.00 <br />100.00 <br />100100 <br />Steel Sheeting .06 <br />.06 <br />.06 <br />.06 <br />Rock Excavation 5.00 <br />5.00 <br />5.00 <br />5.00. <br />Gravel Fill 3.00 <br />3.00 <br />3.00 <br />3.00 <br />Tptal Bid. I,500,000.00 <br />i <br />#I,654.9707.54-- <br />$I9621,937.46-- <br />1*729,199.23 <br />BID OF BYRNE BROS. <br />CONSTRUCTION COKPANY. <br />CHICAGO <br />ILLINOIS. <br />BRICK CONSTRUC<TION. <br />i <br />96" 68.00 <br />j 90" 83.00 <br />84" 87.70 <br />! 78-" 75.00 <br />72" 62.50 <br />601, 5I.00 <br />42 34) 80 <br />30m • 27.00 <br />27n 15.80 <br />24" 8/00 <br />I I8" 5000 <br />I <br />6" 3.00 <br />Outlet structure complete <br />18,359.84 <br />Class A. M. H. <br />200.00 <br />Class B. M. H. <br />440.00 <br />Class G. N. H. <br />649,74 <br />Clask A. Concrete <br />25.00 <br />Class B Concrete <br />I4.00 <br />Excavation <br />2,00 <br />. <br />Reenforcing steel <br />.07 <br />j Timber piling <br />2.00 <br />Timber Sheeting <br />100.00 <br />Steel Sheeting <br />- .06 <br />Rock.Excavation <br />5.00 <br />Gravel fill <br />3.00 <br />TOTAL AMOUNT OF BID <br />$I1,6231,057.72 <br />Claims amounting to 11,995.02 signed and approved, by the Board as follows: <br />Guarantee Garage II4.99 <br />Jos DeWilde I26.37 <br />Jos, Deg-ilde 200,00 <br />Brehmer Electric Co. I.84 <br />IL V71. Lower Co.. .75 <br />Motor Rebuilding & Parts Co 5.I8 <br />Geo. Hoffman Co. 22.50 <br />Book Sho-p 2.00 <br />Service Ptg 2I.80 <br />Nelson & Sons 1150000 <br />'i General Sheet Met:alCo 12.00 <br />j) Motor Castings 74,64 <br />S. B. Supply Co. 1.60 <br />!; General Sheet Metal Co. 7.50 <br />Central Electric Co. I.85 <br />;IWestside Hardware 7.50 <br />Jos DeWilde <br />65.36 <br />Jos DeWilde <br />226.00 <br />Oliver D. Kise <br />3.20 <br />Fruma s Drug Co. <br />150 <br />Ha,gedorn & Webster <br />10,94 <br />City Welding Co. <br />7.70 <br />Ind. Mich Elec. Co <br />79383.52 <br />Grand Leader Co. <br />60.74 <br />Frank Wineek <br />I.04 <br />Koffman & Beutter <br />240,00 <br />Motor Rebuilding Co <br />5.14 <br />Tom Williams <br />.22 <br />Elgin Sales Co.. <br />480.24 <br />Towel Service <br />8.00 <br />Central Electric Co, <br />8.26- <br />Ind.. Tank Line <br />-.370, 22 <br />