Laserfiche WebLink
Tu.esciay, March 15th. , 1927. <br />i <br />BIi3 4F GEDNEY S©NS INC. ST. PETERSBURG FLORI)A.. <br />RE ENFORSED CONCRETE PIPE ** PRECAST. <br />WITHOUT VITRIFIED LINER PLATE WITH VITRIFIED CLAY LINER PLATE <br />5671 <br />60.81 <br />77.74 <br />81, <br />84" <br />73.07 <br />76.57 <br />78" <br />64,78 <br />67.98 <br />72" <br />5I»57 <br />54,52 <br />60 " <br />3894 <br />41.34 <br />42" <br />25.28 <br />27.38 <br />30" <br />10.94 <br />10.'94 <br />27" <br />11.15 <br />1I.I5 <br />24 " <br />9.74 <br />9.74 <br />18" <br />7.12 <br />1j.12 <br />6" <br />I.55 <br />I.55 <br />Outlet Structure <br />I2,000;00 <br />129000.00 <br />M.H. Class A <br />250.00 <br />250,00 <br />M. H. C1assB <br />300,00 <br />300.00 <br />M. H. Class C <br />350.00 <br />350.00 <br />Concrete Class A <br />30.00 <br />30.00 <br />Concrete Class B.- <br />25.00 <br />MOO <br />Excavation <br />3.00 <br />3.00 <br />Reenforcing steel <br />.08 <br />,08 <br />Timber piling <br />2.00 <br />2.00 <br />Timber Sheeting <br />80.00 <br />80.00 <br />Steel Sheeting <br />.20 <br />.20 <br />Rock excavation <br />12,00 <br />I2.00 <br />Gravil Fill <br />3.50 <br />3.50 <br />TOTAL Ar,,OUNT OF BID I$388,672,9-5------- $I,45I,468.I5 <br />The above bid did not have a contractor's Affidavit of Non -Collusion, <br />BID OF _J. J. DUNNEGAN CONSTRUCTION CO.-SHEI+IALU jM IOWA. <br />RE ENFORCED CONCRETE PIPE *** PRECAST. <br />VI <br />ATE 1 <br />VITRIFIED CLAY <br />96" <br />60.00 <br />68.00 <br />941t <br />854,00 <br />92.00 <br />84" <br />85.00 <br />92.00 <br />78" <br />65.00 <br />70.00 <br />72" <br />60.00 <br />65.00 <br />60" <br />35.00 <br />40.00 <br />42" <br />30" <br />17.00 <br />I2.50 <br />2I.50 <br />27" <br />12.00 <br />16.00 <br />I2,00 <br />24" <br />7.50 <br />7.50 <br />18" <br />5.00 <br />5.00 <br />6" <br />1.50 <br />1.50 <br />Outlet Structure <br />I5,000.00 <br />I5,000.00 <br />M. H. Class A <br />225.00 <br />225.00 <br />YT.H. Class B <br />325.00 <br />325.00 <br />M. H. Class C <br />-Concrete <br />375.00 <br />375.00 <br />Class A <br />20.00 <br />20.00 <br />Concrete Class B <br />18.00 <br />I8,00 <br />Excavation <br />2.00 <br />2.00 <br />Reenforcing Steel <br />.I0 <br />Timber piling <br />2.00 <br />.I0 <br />2.00 <br />Timber.Sheetin.g <br />60000 <br />60,00 <br />Rock excavation <br />10.00 <br />10.00 <br />Gravel fill <br />2.00 <br />2.00 <br />TOTAL AMOUNT OF BID I.470,539.45 �**` ****** SI.598,I70.07. <br />40 <br />tie <br />,I <br />• <br />0 <br />