My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ironwood Dr. Pavement Rehabiliation Proj No 117-071A - Walsh & Kelly, Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Ironwood Dr. Pavement Rehabiliation Proj No 117-071A - Walsh & Kelly, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:14:12 PM
Creation date
3/14/2018 9:28:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12. Concrete wmohmwmher shall not be disposed of on the ground or allowed to leak <br />onto the ground. Otherwise, the provisions of2O5-R-636.included inthe Erosion <br />Control Permit, will bnineffect. <br />13. Product for temporary drop inlet protection for erosion and sediment control shall <br />be F|ex8bonn Inlet Filter by Inlet & Pipe Protection, Inc. or approved equal. <br />14. The cost nfTemporary Erosion and SedimemtContwmU, Drop Inlet Protection shall <br />include the removal and disposal of mydinnant, as directed by the project <br />representative, If theF|e#Storm Inlet Filter iadamaged during construction ofthis <br />project either by normal use, remaining sediment or vandalism, it mhmN be <br />replaced at OV cost tothe City. <br />15. Payment shall be made at the Unit Prices as specified in the Proposal as follows: <br />TemponaryEroeionandSodimentConho|---'LG <br />Temporary Drop Inlet Protection .......................... EACH <br />TemporaryGibFence--------------.LFT <br />16. The cost oferosion control items not provided separately shall beincluded in the <br />contract LQUK8costs, <br />xx%|V. SWBGRADETREAT%8ENT <br />A. Prevailing Specifications: 2Q18UNDOTStandard Specifications Sectiom2O7. <br />B. Additions: <br />1, Payment shall be made at the Unit Prices as specified in the Proposal as follows: <br />SubgnadeTreatment, Type |................................ SY8 <br />Subgrode Treatment, Type U............................... SY8 <br />2, Nu.53 Recycled Concrete may beused for aubAodetreatmerd. <br />xxxV SUBBASE FOR PCCP <br />A. Prevailing Specifications: 2018|ND()TStandard Specification Sections 3R2. <br />B. Additions: <br />1Payment shall bemade atthe Unit Prices asspecified inthe Proposal amfollows: <br />Subbase for PCCP............................................... CY8 <br />xxxV. NMAP&TCH|NG <br />A. Prevailing Specifications: 2D18|NDDTStandard Specification Sections 3O4 <br />B, Additions: <br />Pavement to beremoved amshown on the plans shall besaw cut toneat lines at <br />removal limits for full depth prior to removal. Saw cutting for removal ohmU not be <br />measured for payment but shall be considered incidental to the unit coat of this <br />Vemiom701/2B18 8P 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.