My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/31/1926 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1926
>
08/31/1926 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:43:04 AM
Creation date
3/13/2018 10:40:09 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/31/1926
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday, August 3Ist . , 1926 <br />The Board, therefore, this 3Ist. , day of August, 1926, hereby makes a final <br />order for sheet asphalt as the type of pavement with which said street shall be <br />improved and awards the contract for said work to the . Albert Construction Co., <br />at their low bid of 8,767.12. <br />Petitions having been received for the change of type of pavement other <br />than that specified in the preliminary order, City Engineer, 1'�r. N. G. V11ray, <br />makes the following r e port : <br />There are 3I resident freeholders abutting on this street, only ten of <br />whom have signed a. peition for asphaltic concrete. This does not constitute a <br />majority of signatures, therefore, the Board hereb;;- makes a final order for <br />brick on gravel as the type of pavement with. which said street shall be improved <br />and awards the contract for said work to Harry i\r . Barnes at his bind of 141266.00. <br />This being the date set, bids were received, opened and considered on the <br />following Improvement Resolutions: <br />yImprovement Resolution T\?o.I7I9 for the construction of a se,,--er on Kiley <br />Street: <br />storm <br />IS inch, I5 inch I2` inch 8 inch - 6inch 1-',nh.oles - fiT. H.' C ' 8c C. water <br />I <br />J. F. Hipskind 2.90 2.40 I.90 .80 I.00 7.00 I5.00 Inl6tsJC) <br />H. J. Slot 2.05 I.95 I.70 .70 .70 6.50 I7.50 I5.00 <br />Geo. Pontarelli3.00 2.30 I.60 .70 .so 7.00 I5.00 <br />A. Spadoni (;o 2.50 2.I0 I.60 .50 .70 7"00 I4.00 <br />Rocco `'imeri 2.60 2.40 2.20 ..65 .90 7.00 I6.00 <br />j C. E. Reesh 3.25 2.50 2.00 .50 .85 7.00 I6.00 <br />Staples 2.I0 I.70 I.40 .80 .75 6.75 I6.50 <br />Improvement hesolution No.I7I8 for the pavement of Jacob 6treet From <br />'raa_shington to EcKinley: <br />`'beet asphalt T terbb6tions. ''Ipter Uonn. L. S. :'later Uonn S. S. <br />Williston Const. 4.I0II2 II.735 30.00 22.00 <br />ysphaltic ncrete <br />lliston Co. <br />I i 3.86I9 II.II2 30.00 22.00 <br />i <br />!. Improver_�ent hesolution No.I702 for the pavement of ringella 'venue from <br />Marquette ?venue to Lafayette Street: <br />'sheet asphalt Intersections ":. C . L. S. C C. S <br />iS. <br />lliston construct. 5.38 I3.85 33.00 25.00 <br />Reith Eiley Co. 5.49. I3.35 30.00 22.00 <br />j Improvement Resolution No.I700 for the pavement of I'Mgella 'venue from Leeper <br />-venue to the Fast line of Uichigan Central R. P. <br />Sheet ysphalt Intersections C. L. 5% C. S. <br />7'.'illiston Co.. 5.71 I5.II 33.00 25.00 <br />Reith "iley �'o. 6.20 8.96 30.00 22.00 <br />- ysphaltic C.nerete <br />',-illiston Co. 5.39 I4.78 33.00 25.00 <br />Improvement Resolution No.I70I for th✓ pavement of j�ngella Avenue from <br />Lafayette Street to the i"est rail of the So. Michigan R. R . <br />ii <br />6,,,eet Asphalt Intersections C L. S. "'. C. S. S. <br />'dilliston Co 5.86 I2.64 33.00 25.00 <br />Reith Riley Lo. 6.00 I3.02 30.00 22.00 <br />asphaltic Concrete <br />illiston o. 6952 II.87 33.00 25.00 <br />Brick Pavement <br />Highways Improvement 8.64 I5.00 35.00 <br />Improvement Resolution No.I699 for the pavement of Lafayette Street from i <br />Angella Avenue to Parkovash. <br />Sleet Asphalt Intersections __. C . L. c . C , S. S. <br />":'illiston Co. 4.83 9.63 3I.00 . 23.00 <br />Reith Riley Co., 5.92 7.36 30.00 22.00 <br />Asphaltic Concrete <br />illiston Co. 4.57 9.I4 31.00 23.00 <br />1 <br />Improvement Resolution No.I709 for the pavement of Almond Court. <br />Concrete Intersections <br />Hoban and poach 3.36 5.47 <br />• Upon the request of Eston Ball, Contractor, the Board signed an extension <br />on the completion of Improvement Resolution No.I640 for the Grade, curb and walk <br />1 on Twenty rourth 6treet. Extension date October Itth., I926. <br />
The URL can be used to link to this page
Your browser does not support the video tag.