RETURN LINE IN BASEMENT <br />The return lines near the basement floor shall be raised about 51011 from the floor. <br />All return lines ahall be re -connected when main return line is in place. <br />Connect the main returns to the Receiver and Pump hereinafter specified. <br />"VACUUM BOILER FEED PUMP AND RECEIVER" <br />Place in basement where directed, one Vacuum Boiler return pump and receiver of <br />3,000 feet capacity. -This to be driven by electric and of the Economy, the <br />Worthington, the Yoeman Brothers make or equal. Connect same to the electric supply <br />as per building code. Furnish all necessary switches that may be required by the <br />Manufacturer and,Electrical Code. This pump is to supply the boiler with the <br />condensation from the entire heating system and shall be provided with all necessary <br />piping fittings and valves necessary and required by the State Boiler Inspector. <br />BOILER <br />Furnish and place in basement just east of the present boiler. <br />One cast iron boiler of 2,731 feet capacity as rated by the Heating, Piping and Air <br />Conditioning Contractor's Association. <br />Make of boiler to be specified in bid so that: <br />(1) The cast iron base of boiler shall be 12" high, set on 1/4" steel plate, 6" <br />larger on two sides than the width of boiler and same length as boiler; with this in <br />place; new foundation will not be necessary. <br />Smoke Breeching <br />The smoke breeching from boiler to the smoke stack shall be of No. 12 steel, riveted <br />together after true fit has been obtained. The steel in old breeching can be used if <br />in good condition. <br />(2) "Boiler and Breeching Covering" <br />The Boiler from base up shall be covered with 12" asbestos cement, well wired in <br />place. This to be put on with several coats, the last coat to be troweled smooth and <br />covered with canvas- when dry. Paint canvas with 2 coats of pure linseed oil and white <br />lead,- colored -gray. <br />The Breeching to be covered with 1" asbestos, all covering wired or banded in place. <br />The Engineer can check as to its heighth. As the supply is now in and the smoke <br />stack must be considered. <br />(a) The present main supply now connected to old boiler shall be disconnected <br />and run to the header or steam openings of new boiler. The valves on this line shall <br />be replaced where directed. The pop safety valve on old boiler shall be placed on <br />the new boiler and set as directed by the State Boiler Inspector. <br />(b) Removal of old boiler. -- After the new boiler is in place and connected' <br />with the heating plant, cut the old boiler to pieces and remove from the building. <br />The dL-pression in floor where the old boiler sets shall have floor and sides cemented, <br />making a smooth neat job. <br />All pipes in basement, all wall coils and all radiators, and all exposed iron of <br />boiler shall be given two coats of paint, adapted for that purpose. <br />(c) At completion of job, leave building free of rubbish caused by the contractor. <br />(3) The valves, steam gauge, pop -off safety valve now on old boiler can be used in <br />connection with the new boiler pop -off valve to be set as directed by the Boiler <br />Inspector. <br />The Secretary was instructed to advertise for bids in two newspapers. <br />The meeting adjourned at 11:45 A. M. <br />I <br />ATTEST: Clerk <br />10 <br />0 <br />• <br />• <br />0 <br />• <br />