Laserfiche WebLink
provided however,that the number of additional underground street lighting <br />unitsrequested by the city shall not exceed the number provided to be install d <br />in paragraph T n(2) hereof: <br />If the contractor shall be required to furnish additional overhead or <br />underground street lighting unite during the last two years of the termof this <br />contract., -then the city,at the expiration of this contract shall reimburse the <br />contractor for actual expense incurred in running the additional lines.for such <br />lamps,the cost of such lamps and the cost of the installationthereofless the, <br />salvage value of such lines andlampe,provided,however,that if,at the expirations <br />of said eontract,a new contract is awarded to the same contractor,orthe succesor <br />thereof,and said"additional lines and lamps are used and operated under said con <br />tract, the city shall not be required to make any payment on account of the cos <br />of such addtional lines and lamps. <br />8. Street lighting units shall be moved by the contractor to such new <br />locations as the city may by writing direct subject to the following conditions: <br />Such moving of lamps shall be -completed within thirty (30) days after <br />receipt by the Contractor of written notice from the city,Sundays,legal holidays <br />and stormy days not to becounted,provided that the number of such removals shall <br />not exceed one per day ,and provided furthur that such removals may not be <br />required on Sundays,legal holidays and stormy days.Notice that the work of such <br />removal of lamps has been completed shall be given by the Contractor to the city <br />eithin ten (10) days after completion of the work! <br />The actual cost W the Contractor of makeing such relocations shall <br />be paid by the. city to the Contractor within thirty (30) days after said notice <br />has been given,provided,however,that the Contractor will at its expense upon ord r <br />of the Board of Public 'forks change the location in any one year of not to excee <br />tweet five (25) lamps,of which twenty-five (25)changes of location not to excee <br />five ?5) shall be units served frorA the undergroung system. <br />9When street lighting units are installed and abutting property <br />owners pay certain portions or all of the expense of construction or equiment,-. <br />kml the lighting of such units shall not come under this contract but shall be <br />the subject of negotitation and special contract between the city and the Contra for <br />1O.The city shall except said street lighting units and the servives <br />herein specified during the life of this contract and pay as full compensation <br />therefor at the rate and price set out in the accepted bid,to-wit:- <br />loses <br />FOR OVERHEAD STREET LIGHTING UNITS. <br />10000 Lumen ineadescent lamps,pendent fixture,dust proof bowl refractor, <br />mast arm. construction. <br />$54.00 per unit per annum. <br />6000 Lumen incandescent lamps,pendent fixture,dust bowlrefractor, <br />mast arm construction. <br />$45.00 per unit per annum. <br />4000 Lumen incandescent lemps,pendent fixture,dust proof bowel refractor, <br />mast arm construction. <br />$37.20 per unit per annum. <br />2500 Lumen incandescent lamps,pendent fixture,dust proof bowl <br />refrae_tor,bracket or mast arm construction. <br />f <br />$31.20 per unit per annum <br />1000 Lumen incandescent lamps,radial reflector bracket construction <br />$19.80 per unit per annum <br />FOR UNDERGROUND STREET LIGHTING UNITS. <br />I pendent lighting units. <br />10000 Lumen incandescent lemps,iron post,pendent fixture dust proof <br />bowl refractor <br />$58.80: per unit per annum <br />6000 Lumen incandescent lemps,iron post,pendent fixture,dust proof <br />bowlrefractor <br />$48.00 per unit per annum <br />4000 Lumen incandescent lemps,iron posts,pendent fixture,dust proof <br />bowl refractor. <br />$42.00 per unit per annum <br />2500 Lumen incandeseent lemps,iron post,pendent fixture,dust proof <br />bowl refractor <br />$34.80, per unit per annum <br />b <br />• <br />go, <br />• <br />• <br />• <br />• <br />• <br />