My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. Minutes 2/5/10 Meeting
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
02-19-10 Packet
>
2. Minutes 2/5/10 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 11:03:50 AM
Creation date
2/16/2010 4:34:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting -February 5, 2010 <br />6. NEW BUSINESS (CONT.) <br />E. South Side Development Area <br />(1) continued... <br />including construction, design, property <br />acquisition, will be $1,000,000. There is the <br />benefit of a new development site, for which <br />there is expressed interest. But equally <br />important is the drainage issue. When <br />Erskine Village was increased in size, the <br />drainage was not increased. The bypass was <br />constructed after the ponds were in place and <br />it dumps additional water into the ponds. <br />The improvements to the Miami/Ireland <br />intersection included sensors to keep excess <br />water from going into the combined sewer, <br />but then floods the golf course. <br />The new pond is larger and deeper. The <br />existing pond that will remain will be de- <br />mucked. <br />Upon a motion by Mr. Downes, seconded by <br />Ms. King and unanimously carried, the <br />Commission approved Resolution No. 2647 <br />approving and authorizing the execution of <br />an Addendum to the Master Agency <br />Agreement (Erskine Detention Pond <br />Relocation Project -Phase Two) <br />B. South Bend Central Development Area (cont.) <br />(4) Resolution No. 2649 authorizing return of <br />deposit to Place Builders, Inc. (Rink <br />Riverside site) <br />Mr. Relos noted that on September 5, 2008, the <br />Commission accepted a proposal from Place Builders for <br />the development of the former Rink Riverside site. As <br />part of their 6. NEW BUSINESS (CONT.) <br />COMMISSION APPROVED RESOLUTION NO.2647 <br />APPROVING AND AUTHORIZING THE EXECUTION <br />OF AN ADDENDUM TO THE MASTER AGENCY <br />AGREEMENT (ERSKINE DETENTION POND <br />RELOCATION PROJECT -PHASE TWO) <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.