My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Pathfinders Advertising and Marketing Group Inc - Redesign of southbendin.gov
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Pathfinders Advertising and Marketing Group Inc - Redesign of southbendin.gov
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:48:19 AM
Creation date
1/24/2018 10:16:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
����D���������1��� <br />m���u��~o�������°� <br />DESIGN <br />w This project includes the creation ofone (1)overall Vve[oitedesign for Client that <br />communicates the established creative tone and look ofthe brand <br />o Client to provide Visual Identity Guide /V|G\ <br />o Uptoone /1\revision tothe general design and look/feel are included aspart of <br />this scope o[work, however, with aV|Gvvmdon't expect this tobeanissue <br />m Creation mfimages, icons, and creative assets <br />w Client to provide access to an image library <br />w It should be noted that ADA and 508 Compliance requirements will influence the overall <br />design and creative assets the vxebsitecan include <br />• Any new photography or video work will be scoped separately <br />* Client to provide copy assetn/ nspinatiom that demonstrate the "voice" and tone in <br />which copy should bewritten <br />* Modifying/rewriting client -provided content toachieve vvebsitevision <br />m Development ofsite content tobe built with SEObest practices in mind <br />L)EVELOPMENT <br />m Programming ofWord Press -powered CK4SVvebaite <br />o Utilization of pre -defined framework to create efficiencies through existing <br />HTML/C8Sprogramming infrastructures <br />• Mobile (includes tablet) and desktop (responsive) page development for entire vvobsite <br />w Integration of APIs orfunctionality from up to five (5) third-partyappUicationia <br />determined in the strategy phase as part ufproject requirements. Examples of such <br />o Dynamics 3O56&Portal (Required focus) <br />• Esr|story maps <br />u APP1 <br />u Animal Care D'Control' <br />o Microsoft products <br />� Initial' requirements included inthis scope ofwork: <br />o Robust search functionality that includes integration with Dynamics 3G5Service Portal <br />' Returns search results from multiple platforms into one view <br />o Content publishing platform for news and announcements from multiple <br />divisions <br />o Custom user permissions for distributed editing by department and'/or logical function <br />at the City <br />o ADAand SO8Compliance requirements for accessibility <br />mmmPathfinders / All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.