My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Utility Billing System - Tyler Technologies, Inc - Part 3
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Utility Billing System - Tyler Technologies, Inc - Part 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:59:38 AM
Creation date
1/24/2018 9:33:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXO]Mrf Q <br />EseRow DEPosrr QUEMONNA IE <br />Introaftrction <br />From time to time, Beneficiaries may exercise their right to perform verification Services. This is a Service that Iron Mountain <br />provides for the purpose of validating relevance, completeness, currency, accuracy and functionality of Deposit Materials. <br />Prrrpase of Questionnaire <br />In order for Iron Mountain to determine the Deposit Material requirements and to quote Fees associated with verification Services, a <br />completed deposit questionnaire is requested. It is the responsibility ofthe Depositor to complete the questionnaire. <br />Instructions <br />Please complete the questionnaire in its entirety by answering every question with agate data. Upon completion, please return the <br />completed questionnaire to the Beneficiary asking for its completion, or e-mail it to iron Mountain to the attention of <br />vertffcattond%f ronmountain.com <br />&r-rmi, Deposit Questionnaire <br />General Description <br />1. What is the general function ofthe software to be placed into escrow? <br />2. 4n what mediawill the source code be delivered? <br />3. What is the size of the deposit in. megabytes? <br />Requirements for the Execution of the Software Protected by the Deposit <br />1. What are the system hardware requirements to successfully execute the software? (memory, disk space, etc.) <br />2. How many machines are required to completely setup the software? <br />3. What are the software and system software requirements, to execute the software and verify correct operation? <br />Requirements for the Assembly of the Deposit <br />1. Describe the nature of the source code in the deposit. (Does the deposit include interpreted code, compiled source, or a <br />mixture? How do the different parts of the deposit relate to each other?) <br />2. How many build processes are there? <br />3. How many unique build environments are requiredto assemble die material in the escrow deposit into the deliverables? <br />4. What hatdware is required for each build environment to compile the software? (including memory, disk space, etc_) <br />5. What operating systems (including versions) are used during compilation? Is the software executed on any other operating <br />systems/version? <br />6. How many separate deliverable components (executables, share libraries, etc.) are built? <br />7. What compilers/linkers/other tools (brand and version) are necessary to build the application? <br />S. What; if any, third -party libraries are used to build the software? <br />9. flow long does a complete build ofthe. software take? How much of that time requires some form of human interaction and <br />how much is automated? <br />10, Do you have a formal build document describing the necessary steps for system configuration and compilation? <br />It. Do you have an internal QA process? If so, please give a brief description of the testing process. <br />12. Please list the appropriate technical person(s) Iron Mountain may contact regarding; this set of escrow deposit materials. <br />.please provide your technical verification contact information below: <br />COWANY: <br />SIGNATURE. <br />PRINT i "R- <br />AbD 1: <br />ADDAIR5 2: <br />CITY, STATE,ZIP <br />TEI.E1'1IONE,. <br />PJAU1.ADARESS- <br />For additional information about Iron Mountain Technical Verification Services, please <br />,ontact <br />Manager of Verification Services at 978-667-3601 ext.100 or by e-nail at mailto. verificstion@jronmouutain.eo!r <br />M3P D Rev. 06101/08 02008 Iron Mountain Incozporated, Page 15 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.