My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Utility Billing System - Systems & Software, Inc. - Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Utility Billing System - Systems & Software, Inc. - Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:53:51 AM
Creation date
1/24/2018 9:22:01 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
For system modifications or interfaces, S&S will complete Business Requirement documents to ensure <br />business alignment can be achieved through programmatic modifications. These documents will be <br />submiRted: to the Customer for approval. If additional scope is required, a change control will be <br />processed. <br />S&S, will complete Business Process Analysis Documents that contain workflow steps and configuration <br />requirements of the proposed enQues,ta workflows in, each functional area (e.g., billing, cash, credit & <br />collections, customer service, metering). <br />7. Data Conversion <br />The data conversion process consists of several activities grouped into the following three segments: <br />• Data Sources Assessment <br />• Data Conversion Design and Testing <br />• Data Conversion Execution <br />The assessment segment entails identification and analysis of the data sources including defining a <br />repeatable method for extracting data from the sources. Data mapping and verification, as well as the <br />preparation and testing of conversion routines are accomplished during the design and testing segment. <br />During the execution phase, data is moved from the various sources to the target system using imethods <br />developed in the previous segments. The conversion process is executed in two parts: initially in an <br />iterative manner to perform parallel billing and testing; then finally immediately prior to production, Go - <br />Live. We will work with South Bend to determine the imost appropriate data format that will allow for ease <br />of conversion for both parties. <br />MA <br />
The URL can be used to link to this page
Your browser does not support the video tag.