My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(1) Proposal from The Lakota Group
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
02-05-10 Packet
>
6C(1) Proposal from The Lakota Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 10:28:47 AM
Creation date
2/3/2010 9:24:30 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional Services <br />Overall, this proposal does not include the following tasks: <br />❑ Development Feasibility Studies of sites (Real estate analyst can prepare as later phase). <br />❑ Downtown Fiscal Assessment /Projections (Real estate analyst can prepare as later phase). <br />❑ Capital Improvement Programming or Cost Estimating for Public Improvements (Engineer can <br />prepare as later phase). <br />❑ Detailed Civil, Traffic, or Environmental Studies/ Engineering. (Engineer can prepare as later phase). <br />❑ Property or Legal Surveys. (Surveyors prepare as later phase). <br />❑ Building Design. (Architects prepare as later phase). <br />❑ Site /Landscape /Streetscape /Signage Design or Construction Documents ( Lakota can prepare as <br />later phase). <br />❑ Design Guidelines ( Lakota can prepare as a later phase). <br />The Lakota team will work closely with City staff and Team Project Committee to refine the project scope <br />and schedule /manage the project. <br />Lakota and Baker & Daniels have the resources, experience, and expertise to conduct a planning assignment <br />of this scope. Baker & Daniels will be a sub - consultant to Lakota. Baker & Daniels' professional fees will be <br />invoiced to the City without any mark -ups or increases at the hourly rates listed below and on the work scope <br />project spread sheet. <br />PROFESSIONAL FEES /EXPENSES <br />Professional fees and reimbursable expenses for this assignment are estimated as follows: <br />The Lakota Group $28,680 <br />Baker & Daniels $27.000 <br />Total Fee Estimate $55,680 <br />Expenses (7% of feel S 3.898 <br />Total Budget $59,578 <br />The above fee estimates can be adjusted based on clarifications or changes to the work scope made by the <br />City. The fee estimate includes all the meetings outlined in the `York Scope. It does not include any additional <br />meetings, project reviews, presentations, studies, plans, or designs other than those outlined above. If <br />requested for City budgeting purposes, the team will provide fee estimates for additional tasks. Any additional <br />services rzquested of the Team will be billed on an hourl� rate basis according to each firm's current hourly rater. <br />Lakota Hourly Billing Rates (2010): <br />• Principal $240 <br />• Vice President $190 <br />• Senior Associate $170 <br />• Project Manager /Planner /Designer $140 <br />• Planner /Urban Designer /Landscape Architect $110 -130 <br />• Research /Drafting Staff $90 <br />THE LAKOTA GROUP Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.