Laserfiche WebLink
EXHIBIT 1 <br />Date: 05 February 2010 <br />SCOPE OF WORK <br />DESIGN SERVICES (Including 2.4, 2.5, and 2.6) FOR THE STANLEY COVELESKI IMPROVEMENTS FOR THE <br />FOLLOWING WORK <br />New netting/backstop system (see note 1) <br />The existing pole supported backstop netting system will be removed and replaced with a modern design <br />utilizing cables only for improved visibility. The height of the net will be increased to accommodate future <br />upper level improvements. The system will be supported by either new field light poles or new tie down <br />poles located adjacent to the foul ball poles on both the first and third base lines. The proposed system <br />will utilize dyneema rope or galvanized steel cabling and spectra netting. <br />New field/wall pads <br />Existing field wall pads will be removed and replaced with new pads. In addition to field wall pads, new <br />padding will be installed at railings as appropriate for player safety. <br />Replace field lighting fixture <br />Existing playing field lighting system will be reviewed by Musco lighting to determine their condition. <br />Existing lights will be re-tamped or the entire system will be replaced. NOTE: Musco typically includes all <br />engineering services for new systems including pole and foundation design; therefore, no fee is included <br />in this proposal for engineering of the playing field lighting system. <br />Refurbish restrooms on concourse (see note 1) <br />Existing toilet rooms (2 Men, 2 Women) located at the ends of the concourse, currently serving as <br />storage, will be completed and used for their intended purpose. Work will include installing fixtures <br />(plumbing stub outs exist) and finishes as required to make the spaces operational. Existing plumbing <br />locations will have to be verified as in compliance with ADA requirements. The types of finishes will <br />match what is currently installed in similar areas. <br />Fix seating bowl <br />The existing seating bowl will be reviewed and areas requiring cosmetic improvements will be <br />documented. All control joint sealant will be removed and replaced. Irregular concrete patches will also <br />be removed and replaced. <br />Repair gutters on existing concourse roof <br />The existing guttering system will be evaluated and recommendations made as to either repair or replace <br />with new. <br />Renovate dugouts (see note 1) <br />Existing dugouts will be improved with new benches and storage racks, flooring, painting, and other <br />amenities similar to new minor league facilities. ADA improvements within the dugouts are not <br />anticipated and not part of this scope of work. <br />