Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting -January 15, 2010 <br />The Erskine Plaza Pond Project started as a <br />concept to remove the two drainage ponds <br />within the Erskine Plaza commercial <br />development to create new development sites <br />and to relocate the storm water collection <br />ponds into a controlled sequence of ponds <br />and structures, through the Erskine Park Golf <br />Course. The economics of the project never <br />worked for the project but the need to create <br />new sites and to resolve drainage issues <br />persist. <br />The project consists of removing the existing <br />pond along Miami, reshaping and improving <br />the existing interior pond, and creating a new <br />pond at the southwest corner of Hawbaker <br />and High Streets. Overflow from the pond <br />will still be directed to the storm water <br />system and the golf course, but the need to <br />divert water should be minimized by the <br />improved pond percolation and design of the <br />systems. The reclaimed pond site will be <br />filled and could become space for two new <br />south side tenants. <br />Mr. Varner asked who is responsible for <br />High Street between the Menard's parking lot <br />and Ireland Road. It is in terrible shape. Mr. <br />Schalliol responded that staff is trying to <br />determine that. The Meridian Title contract <br />on the ratification list at the end of the agenda <br />looks for that information, among other <br />information. <br />3. APPROVAL OF CLAIMS <br />Redevelopment Commission Claims submitted January 15, 2010 for approval. <br />305 FUND SBCDA BOND <br />Rieth Riley Construction Co 89,052.22 101 N Michigan St. <br />324 AIRPORT AEDA <br />DLZ 40,080.00 Expansion of Olive Rd & Pine <br />Indiana Michigan Power 7.00 Sprinkler 501 Wenger St. <br />5 <br />