Laserfiche WebLink
® Tuesday, Apr i l 22nd . , 1930 <br />and no written remonstrances Mere filed and the Board, t herefore , decides to take final <br />action onssai.d condemnation Resolution No.2332 and declares same in all things ratified, <br />confirmed and approved without `modification,, The Board. now orders that a list or roll <br />be prepared of all owners and holders of property and. of valuable interests therein <br />sought to be taken which list or roll shall also described the property beneficially <br />affected by such condemm Lion. <br />ldr. John Gavit t , attorney for the hew York Central Ra it road Company l <br />� <br />and T. A. Hynes, President of the New Jersey, India . and Illinois-"ailroad Company, <br />were present and filed with the Board the signed copies of the contracts for Grade II <br />separation under Modified Track Elevation Resolution No.5. Contracts are as follows-: <br />i <br />C ONTRA,.CT WITH IMIK, YORK CENTRAL RAILROAD C0MP qTY. <br />I <br />This agreement made this Ilth. , day of April, 1930 between khe New I <br />York Ventral Railroad Company end the City of South Rend, a municipal corporation, by an <br />through its Board of Public Works. <br />V ITNESSETH : <br />",orks <br />Whereas, on the 3rd. , del. of January, I9301 the Board of Public <br />of the City of `'ouch Bend adopted and placed on file its Grade Leper-ti on Resolution I <br />No.5, providing for the separation of grades of the tracks of the New York Central u <br />Railroad Company at "ivision, `alnut and Cherry streets ; and <br />i! <br />Whereas, on the Ist. , day af April 1930, said Vesolution No.5 was � <br />modified by the filing and adopttion of Todified Resolution No.5; and <br />• <br />Whereas, on the I8th., day of February, I930, a petition signed by mol e <br />- c B it <br />than fifty resident freeholders of the City of mouth end was filet, petitioning the <br />Board of Public Yorks to enter into an agreement with the New York Ventral railroad <br />i <br />Company for division of cost of all work necessary under said grade separation project, <br />whereby the City of South Bend shall pay thirty-five percent (35%) of the cost cf the <br />grade separeti on project contemplated by Resolution No.5 as modified, pursuant to <br />section 2 of the Acts of the General Assembly of Indiana, approyed March 9th. , I927; <br />• <br />Therefore, in consideration of the premises, it is agreed: I <br />i <br />First: That the total cost of all work performed and meter ials. fur- <br />a <br />nished to carry out the entire grade separation project, including all work or expense . <br />necessary to the changing of the grades of the tracks and the grades of the streets !� <br />Il <br />( in6lud ing cost of engineering, inspection, watchman on the work, construction and <br />ma. intenance of necessary temp orai?y works and crossings) as provided- for under <br />i� <br />TGLodified Resolution No.5, insofar as the said resolution applies to the New York Central,, <br />;! <br />Railroad. Company, shall be divided between the City of South Bend and the New York <br />Ventral Ra-ilroad as follows: <br />A). The cost of separation of grades of Division and .'fialnut Streets <br />with the main line of the New Tork Central railroad Company, including all expense for I <br />1 • raising the existing tracks and facilities, restoring the railroad; depressing division it <br />Streets and its facilities to a width of 80 feet, including the construction of 52 <br />foot pavement roadway and 14 foot sidewalk spaces; depressing Walnut Street and its <br />facilities North of Division �tr-et to a width of 98 feet, including construction of <br />30 foot paved roadway and 9 foot sidewalk spaces; depressing y'alnut Street and its <br />facilities South of Divisi on z)treet to s. width of 60 feet , include n construction of 40 <br />foot paved roadway and 10 foot s id ewalk spacesl the drainage and necessary than ge s in <br />i <br />other city-wned facilities, indluding such temporary water connections as may be <br />i <br />required; the construction cf the necessary five track s teel raulroe d bridge with the <br />