Laserfiche WebLink
18. Overtime work requiring higher than regular rates. <br />20. Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />21. Subsurface Utility Engineering (SUE) locating and designating information when <br />investigating utility conflicts as may be directed. <br />tr ffie signal systems. <br />24. Providing services in connection with a public information meeting or other public forum or <br />proceeding. <br />25. Providing special surveys, environmental studies and other submissions beyond those <br />already described required for approvals by authorities or others having jurisdiction. <br />26. Providing services of other consultants than those described and included in the scope of <br />services. <br />27. Preparation or review of other studies, assessments or impact statements, <br />28. Preparing or securing permits not already identified within the scope of services. <br />A2.02 Additional Services Not Requiring Olvner's Mritten Authorization <br />A. Engineer shall advise Owner in advance that Engineer is commencing to perform or furnish the <br />Additional Services of the types listed below. For such Additional Services, Engineer need not <br />request or obtain specific advance written authorization from Owner. Engineer shall cease <br />performing or furnishing such Additional Services upon receipt of written notice from Owner. <br />1. Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than "or -equal" items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />3. Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />4. Additional or extended services during construction made necessary by (1) emergencies or <br />acts of God endangering the Work (advance notice not required), (2) the presence at the Site <br />of any Constituent of Concern or items of historical or cultural significance, (3) Work <br />damaged by fire or other cause during construction, (d) a significant amount of defective, <br />Page 4 <br />(Exhibit A — Engineer's services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />