My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:29:09 AM
Creation date
12/22/2017 11:59:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15. Take cross -sections at pecified intervls across the right of way of public roadways and or <br />the project limits whichever is further out. Additional cross -sections shall be taken at <br />intersection of streets, roads, railroads, driveways etc. Obtain elevations of existing <br />structures such as culverts, utilities and other structures. <br />16. Indicate spot elevations at all finish floors, at each threshold, building edges, insets and <br />projections, exterior platforms, steps, corners, building entrances, break in grade, ramps, <br />area ways, tree grates, top and bottom of curb within the project limits. <br />17. Engineer shall furnish a hard copy together with all field survey information collected on <br />electronic media. Engineer shall also prepare master drawings {1-foot contours) from data <br />collected in topographic survey using AutoCad Civil 3D and still submit hard copy <br />together with electronic format. Engineer shall delineate and label the location of all <br />buildings, structures, fences, railings, signs, walls, walks, paved areas, curbs and other <br />permanent structures such as drainage culverts, utilities and other structures. <br />ROM ! <br />• <br />M.4111 <br />NOW • IN 1,11 <br />B. Engineer's services under the Topographic Survey and CAD drawing Phase will be considered <br />complete on the date when the revised Survey and other deliverables have been delivered to <br />Owner. <br />1111 Mil <br />• <br />• <br />1 . <br />! •Will <br />• <br />Page 20 <br />(Exhibit A -- Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.