My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:29:09 AM
Creation date
12/22/2017 11:59:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1 — BASIC SERVICES <br />A1.01 Topographic Survey and CAD Drawing <br />A. Engineer shall: <br />1. Consult with Owner to define and clarify Owner's requirements for the Project and <br />available data. <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer's Basic Services. <br />3. Undertake topographic survey of the project area along US 20 Bus. Corridor west of the <br />US 31/ US 20 interchange. The project limits are shown in Figure 1 and within existing <br />right of way limits and described below, <br />a. US 20 Bus. (Lincioln Hwy) <br />Beginning from West limit at 300f t wes of Poppy Rod/US 20 Lift Station and ending at <br />ST. Joseph Valley Parkway Interchange to the East. <br />b. Poppy Road <br />Beginning at US20 north right of way and ending 150 feet north on Poppy Road. <br />c. Terre Verde Hills <br />Beginning at US 20 south right of way and ending 150 feet south on Terre Verde Hills <br />d. Pine Road <br />Beginning at US 20 south right of way and ending approximately 2650 feet south just <br />past an unnamed road. <br />e. Olive Road <br />Beginning at US 20 north right of way and ending 150 feet north on Olive Road. <br />Survey includes 9,100 feet of linear roadway length by varying width of existing right of way. <br />�W <br />Page t8 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.