Laserfiche WebLink
1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, <br />officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, <br />and other expenses, arising from or out of the negligent performance of this Contract by Contractor, <br />or because of arising out of any defect in the goods, materials or equipment supplied by the Quote <br />provider. <br />VI. INSURANCE <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 103 <br />B. Additions: <br />All Contractors and subcontractors doing business with the City of South Bend shall present a <br />Certificate of Insurance showing coverage in the following minimum amount: <br />a. General Liability: Premises -Completed Operations or Products, Bodily Injury and Property <br />Damage Combined Single Limit - $5,000,000. <br />b. There shall be no exclusion for explosion, collapse or underground hazard. <br />c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000. <br />d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. <br />e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. <br />VII. CONTROL_ OF WORK <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 105 <br />B. Additions: <br />1. The complete responsibility for this project lies with the Director of Public Works of the City of South <br />Bend, Indiana acting through his authorized representatives. <br />2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, <br />equipment and supplies to perform all work required underthis item. There will be no direct payment <br />for this item. <br />3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, <br />site security, erosion control, and protecting adjacent properties. <br />4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No <br />work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South <br />Bend Department of Public Works. <br />5. The delivery and installation schedule must be approved by the Morris Performing Arts <br />Center; Contact Jim Monroe (ph. 674-674-245-6074). <br />Vlll. LEGAL RELATIONS <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 107 <br />B. Additions: <br />1. The Owner, where mentioned in these documents, is the City of South Bend. The Architect, <br />where mentioned in these documents, is ALLIANCE Architects (interior Designer is Tango <br />Design). <br />2, The Contractor shall apply for and obtain any and all required permits for the work from local, state, <br />and federal agencies and shall comply with permit requirements, including the St. Joseph County <br />1 City of South Bend Building Department. <br />3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor <br />shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with <br />the Secretary of State of Indiana to engage in business within the State of Indiana. <br />4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner <br />reserves the right to immediately terminate the public work project awarded should the Contractor <br />be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result <br />in the forfeiture of Contractor's performance bond to the Owner. <br />IX. PROSECUTION AND PROGRESS <br />Version 10/1812016 Page - 2 Public Works Quote <br />1031-2017 — Furniture - Morris Performing Arts Center <br />