Laserfiche WebLink
_Wednesday Evening, Lay.22nd. , 1929 <br />:7 <br />0 <br />0 <br />Boe�rd met in regular session at 7-I5 P. I% All members present. Mr. 7. G. <br />ra.y, City zngineer, absent. 11r. R. L. Pike, Assistant engineer,. present. <br />This being the date set, continued hearing was had on the assessment roll for <br />the sewer improvement on Southwood Avenue under Improvement Resolution No.2I42. <br />In the above named assessment roll, the Board decides to continue hearing until <br />June 5th. , 1929, at 7ee15^P AE.. <br />The following tabulations of bids were filed by R. L. Pike, ass 1stant engineer: <br />Tabulation of bids for the pavement on Marietta street from the south line of <br />Sample Street to the south line of the Ist. , alley south of ~ample Street under Impro <br />vement Resolution No.2239: <br />Reith Riley Const. co., <br />1,457.45 <br />Tabulations of bids for the sidewalk improvement on the south one half of <br />Sample Street from the west line of Industrial Drive to a point I280 feet west of the <br />west line of Industrial Drive under Improvement Resolution No.2220: <br />?1. N. Barnes Frame & Zimmer Bston Ball. T. Tranberg <br />1,207.36 I,552.32 I,466.08 I,185.80 <br />Bids having been received for the pavement of Yarietta Street from the sot:th <br />line of Sample Street to the south line of the first alley south of Sample 'treet under <br />Improvement Resolution No.2239, the Board this 22nd. , day of TA I929, hereby awards <br />the contract for said improvement to Reith Riley Construction ompany at their low <br />bid of $I,457.45 for sheet asphalt heavy traffic pavement. <br />Bids having been received for the side walk improvement on the south one half <br />of 8am-ole Strut from the west line of Industrial Drive to a point 1280 feet west of <br />the west line of Industrial Drive under Tmprovement Resolution No.2220, the Board this <br />22nd. , day of h"ay T929 , hereby awards the contract for said improvement to E. T. <br />Tranberg at his low bid of l', T85.80. <br />R. L. Pike, assistant engineer, submitted t)artial estimate:-No.I for'the:side <br />walk improvement on the south side of Sam±rle 'street under Improvemt Resolution <br />No.2220, in accordance with the terms ^f the contract between the ity and F. T. <br />Tranberg, contractor. The. Board signed and approved same in the amount of 1,007046. <br />R. L. Pi'_ce, assistant engineer, ,,submitted partial estimate ,No. I for the <br />grade, curb, walk, sewer improvement on "orby Street from the east line of the Third <br />Plat of Parr Place jiddition to the 'ity of South Bend, Indiana, to a point 152.6 feet <br />east of the east line of said 'Third Plat of Park Place, in accordance with the terms <br />of the contract between the "ity and =�. T. Tranberg, contractor, under Improvement <br />Resolution No.22I0. The Board signed and approved sa:e in the amount of I,403.60. <br />The Board approved the Guarantee Bond of Rocco "�imeri in the amount of <br />3303.13 for the local sewer improvement on Southwood --venue from Harriett Street to <br />Greenlawn Avenue under Improvement Resolution No.2I42. <br />The Board approved the bond of contrator in f ay. r of Clarence I. Lee in the <br />amount of pI,000.00 signed by 1a.ryland Casualty company. <br />The Board approved the Excavation bond of D. C. St. Clair in the amount of <br />I,000.00 signed by the Employers Liability Assurance Corporation. <br />The Board signed and approved the assignment of the contract for the,..grade, <br />curb and walk improvement on the south side of Division Q'treet from_'Kentucky "street <br />to a point 138.1 feet east; on Ford atreet from Kentucky street to Ioaw Street; on <br />4ntueky Street from Division krset to Ford Street, under Improvement Resolution <br />No.2I481 by the administrator of the estate of Alex Bukowski to E. T. Tranberg. The <br />• 'Board alsoapproved the assignment of the bond by the United States Fidelity and <br />Guaranty CO. , by G. A. Farabaugh, Attorney in fact. <br />�r€gineer, �i. G. astray, the Board approved <br />Upon the recommendation of City <br />the petition of the Indiana and P ichigan Electric Company to construct underground <br />duet line on Lincoln Way East between Carroll 6treet and Columbia Street, as outlined <br />in their petition of Yay 2Ist. , I929, provided that all cuts in pavement are preberly <br />'j replaced and all streets protected f^r traffic during the laying of the duct lines. <br />• <br />This being the date set, hearing was had on the assessment roll for the local <br />sewer improvement on T°eade street from the alley north of Lincoln -Tay 4'dest to lwood <br />Avenue under Improvement Resolution No.2183. In the above named assessment roll, no <br />remonstrators appeared and no written remonstrance was filed and the Board, being <br />fully advised in the premises, finds that the several lots and parcels of have benefite <br />in the amounts named on said assessment roll. The Board, therefore, decides to take <br />final action on said assessment roll and declares same in things ratified, confirmed <br />