Laserfiche WebLink
• <br />• <br />0 <br />Tuesday, April 23rd., 1929.363 <br />i r <br />This being the da e set, bids were receivgd, opened- and reaid for the constructioi <br />of pavement on 26th , Street. from MishAwa'ca Avenue to a point 394 feet south of <br />the south line of Pleasant Street. Bids are as follows: <br />illiston Const. <br />Co. <br />Albert Const. Co.. <br />Reith Riley <br />H. N. Bari <br />walk .25 <br />.20 <br />.I8 <br />.20 <br />concrete curb .50 <br />.50 <br />.46 <br />.50 <br />marginal curb .40 <br />.40 <br />.40 <br />no bid <br />grading .85 <br />.95 <br />.70 <br />.75 <br />sheet asphalt 2.64 <br />2.64 <br />2.62 <br />no bid <br />asp. concrete 2.54 <br />2.54 <br />2.50 <br />no bid <br />concrete 2.44 <br />2.50 <br />2.38 <br />2.65. <br />storm water inlets I2.50 <br />I200 <br />12.50 <br />12.00 <br />reset inlets no bid <br />no bid <br />no bid <br />2.00 <br />reset 17.H.C, no bid <br />no bid <br />no bid <br />3.00 <br />water eon.l.s.34.00 <br />37.00 <br />32.00 <br />28.00 <br />water con.. s.s.27.50 <br />27.00 <br />27.00 <br />24.00 <br />0 1.s. 40:00 <br />43.00 <br />38.00 <br />32.00 <br />.S.S. 34.00 <br />37.00 <br />33.0" <br />26.00 <br />sewer corn. 1.25 <br />1.25 <br />I.20 <br />I.50 <br />8" Pine I.00 <br />I.00 <br />.90 <br />1.00 <br />This being the date set <br />bi^.s were <br />received, opened <br />and read for 'the <br />construct- <br />ion of ?pavement on Laurel street <br />from "ivision street <br />to a point 130.56 <br />feet <br />south of the south line of <br />Yonroe <br />Street under Improvement <br />nesolu.tion P?o.2I62. <br />Bids are as follows: <br />Williston So. <br />Albert <br />Co. Reith `iley <br />Co. H.N, Barnes <br />concrete walk .20 <br />.20 <br />.20 <br />.20 <br />concrete curb .50 <br />.50 <br />.-50 <br />.50 <br />marginal eurbm .40 <br />.40 <br />.40 <br />no bid <br />grading .70 <br />.95 <br />1.00 <br />1.00 <br />sheet asphalt 2.40 <br />2.44 <br />2.45 <br />no bid <br />asp. concrete 2.30 <br />2.34 <br />2.34 <br />no. bid <br />concrete I.95 <br />2.I5 <br />2.02 <br />2.00 <br />storm water inlets I2.50 <br />I2.00 <br />I2.50 <br />12.00 <br />reset inlets <br />2.00 <br />and T% A. C. 3.00 <br />3.00 <br />3.00 <br />3.0 00 <br />-3" I.- C. L. S. 22.00' <br />23.00 <br />28.00 <br />25.00 <br />n `7. C. S. S. I7.f0 <br />I8.00 <br />24.00 <br />20.00 <br />I W. C. L..S. 30.00 <br />26.00 <br />35.00 <br />30.00 <br />I" TV. C. S.S. 25.00 <br />21.00 <br />28.00 <br />27.00 <br />sewer Conn. I.25 <br />I.25 <br />1.25 <br />I.50 <br />8"pipe I.00 <br />.I.00 <br />I.00 <br />I.00 <br />This being the d^te set, bids were received, opened and read forthe constructimi <br />of pavement on Chapin Street <br />from Ford Street <br />to Prairie -&ven-ge under Improvement . <br />Resolution _IUo.2I92. Bids_ are <br />as follows: <br />Williston Co. <br />Albert .Co. <br />Reith Riley Co. <br />concrete walk .20 <br />.I8 <br />.I8 <br />concrete curb, .50 <br />.50 <br />.46 <br />ra; rzinal curb .4-0 <br />.40 <br />.40 <br />eomB 1 n, & G. .85 <br />.90 <br />.92 <br />grading I.60 <br />1.45 <br />I.40 <br />sheet asphalt 2.19 <br />2.73 <br />2.76 <br />asr. concrete no bid <br />2.63 <br />2.65 <br />concrtte flc�55id <br />2.55 <br />2.49 <br />it extra concrete 19.00 <br />I8.50 <br />18.00 <br />lighting system I375.00 <br />I300.00 <br />-1392.00 <br />YanhoI es 100.00 <br />90.00 <br />95.00 <br />storm water inlets 20.00 <br />18.00 <br />I9.00 <br />FI. 0. L. S. 35.00 <br />36.00 <br />37.00 <br />W. C. S. S. 28.00 <br />30.00 <br />33.00 <br />I" 7I.C.L.S. 39.00 <br />4I.00 <br />39.50 <br />I" W.C.S.S. 35.00 <br />35.00 <br />34.50 <br />sewer Conn. I.25 <br />I.50 <br />I.50 <br />81, Pipe I.25 <br />1.00 <br />.90 <br />1!7" water exten. no bid <br />Mt <br />I2.010n <br />n n no bid <br />I5.00 <br />no bid <br />